Drains Details

S.No District River Drain Name Drain Type Total Discharge (MLD) Remarks Last Update Date
1 Chitrakoot Mandakini 'Nala near Shaheed Baba, Taronha, Kachhi Chhawni, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:17 AM
2 PrayagRaj Yamuna 3 small drains Near Mahewaghat Untapped Drains 2.11 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
3 PrayagRaj Ganga A.D.A. Colony Nala / Jwaladevi Untapped Drains 4.28 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
4 Saharanpur Harnandi (Hindon) Abdulla Colony Untapped Drains 0.21 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
5 Meerut Kali AbuNallah-1 Untapped Drains 39.22 Action to be taken 01-Jul-2024 12:00 AM
6 Meerut Kali AbuNallah-2 Untapped Drains 116.00 CA for I&D and 220 MLD STP signed on 05.09.2023 01-Jul-2024 12:00 AM
7 Ayodhya Saryu Afeemkothi Untapped Drains 0.25 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
8 Saharanpur Harnandi (Hindon) Aggarwal Dharamshala - 1 Untapped Drains 0.15 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
9 Saharanpur Harnandi (Hindon) Aggarwal Dharamshala - 2 Untapped Drains 0.70 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
10 Sitapur Sarayan Alam Nagar Nala Untapped Drains 0.22 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:04 PM
11 Hathras Karvan Algarji Drain-I Untapped Drains 0.24 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
12 Hathras Karvan Algarji-II Untapped Drains 0.23 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
13 Aligarh Aligarh Drain ( Irrigation ) Aligarh Drain Untapped Drains 97.39 NMCG provided observations on DPR on 15.01.2024 and reply from CE Ganga sent to SMCG on 06.2.2024. SMCG asked for further clarifications on 04.04.2024. Clarification has been given on 07.06.2024 01-Jul-2024 12:00 AM
14 Agra Yamuna Almirah Factory Untapped Drains 0.04 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24. 01-Jul-2024 12:00 AM
15 Mathura Kosi Arterial Channel Ambedkar Nagar Jatav Basti Nala Untapped Drains 0.49 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
16 Agra Yamuna Ambedkar Park Untapped Drains 0.78 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
17 Farrukhabad Ganga Amethi Kohna Untapped Drains 0.12 This is small drain. It will be Diverted and covered under Bhairoghat drain I&D works. 18-Sep-2024 11:17 AM
18 Mathura Yamuna Annyor Untapped Drains 0.94 DPR for tapping of said drain is being prepared by UPJN(Urban) under SBM 2.0 04-Jul-2024 03:59 PM
19 Saharanpur Harnandi (Hindon) Ansari road Near Dr. Neha Clinic Untapped Drains 0.29 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
20 Agra Yamuna Aqua Cool Water Treatment Untapped Drains 0.02 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
21 Mahoba NA Arimandan Nala Untapped Drains 1.66 Discharge of this drain falling to nearby Dariba sewage pond 18-Sep-2024 11:42 AM
22 Kanpur Nagar Pandu Arra Nala Untapped Drains 5.00 Bio remediation treatment is being done by Kanpur Nagar Nigam. 18-Sep-2024 11:45 AM
23 Ghaziabad Harnandi (Hindon) Arthala Mohan Nagar Drain Untapped Drains 5.41 DPR for I&D and STP (68 MLD) has been sanctioned in AMRUT 2.0 11-Jul-2024 10:49 AM
24 Agra Yamuna Artoni Untapped Drains 0.21 Construction of 0.35 MLD capacity DSTP at Artoni village is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
25 Mathura Yamuna Aurangabad Downstream Nala Untapped Drains 0.73 Proposed to be tapped in 60 MLD STP Gokul Barrage under Mathura Sewerage Scheme. LOA issued. 01-Jul-2024 12:00 AM
26 Mathura Yamuna Aurangabad Upstream Nala Untapped Drains 1.02 Proposed to be tapped in 60 MLD STP Gokul Barrage under Mathura Sewerage Scheme. LOA issued. 01-Jul-2024 12:00 AM
27 Ambedkar Nagar Ghaghara Azra Nala Untapped Drains 2.37 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:30 PM
28 Shamli Krishni Babari - Banti Kheda Nala Untapped Drains 3.00 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
29 Mathura Kosi Arterial Channel Bada Nala Untapped Drains 0.12 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
30 Pratapgarh Ganga Badri Vishal Nala (Manihari Nala) (Manikpur Nagar Panchayat) Untapped Drains 0.03 DPR Preparation is being done by U.P.J.N (Urban) under SBM 2.0 01-Jul-2024 12:00 AM
31 Saharanpur Harnandi (Hindon) Badshahi Masjid Untapped Drains 0.07 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
32 Ayodhya Saryu Bahadurganj A Untapped Drains 1.00 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
33 Ayodhya Saryu Bahadurganj B Untapped Drains 0.23 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
34 Agra Yamuna Bahadurpur Gaon Untapped Drains 0.04 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
35 Gorakhpur Rapti Bahrampur Nalla Untapped Drains 4.33 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
36 Deoria Ghaghra Bairahna Baba Nala(Azad Nagar South) Untapped Drains 0.01 NA 04-Jul-2024 04:06 PM
37 Mirzapur Ganga Balaji temple Untapped Drains 2.20 Work in progress. 01-Jul-2024 12:00 AM
38 PrayagRaj Yamuna Balua ghat JCC Backside Untapped Drains 0.15 LOA has been issued, contract bond formation is in progress by UPJN(R) under Mahakumbh-2025 01-Jul-2024 12:00 AM
39 Ghaziabad Yamuna Banthala Canal Drain Untapped Drains 17.00 Industrial Drain. To be taken up by UPPCB. 11-Jul-2024 10:54 AM
40 PrayagRaj Ganga Baretha/Kashipur Untapped Drains 1.05 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
41 Farrukhabad Ganga Bargadiya Ghat drain Untapped Drains 1.23 tapping work in progress at 17.70 MLD STP at Fatehgarh-Farukhabad. It'll be completed by 30.09.2024. 18-Sep-2024 11:18 AM
42 Gorakhpur Rohini Bargadwa Gao Jalan Nalla Untapped Drains 8.16 D.P.R. for “Gorakhpur Sewerage Scheme Zone-C, Part-2” amounting Rs. 566.15 Cr has been sanctioned under AMRUT 2.0. GO is awaited. 03-Jul-2024 04:55 PM
43 Lucknow Gomti Barikala Drain Untapped Drains 1.80 Date of start of 3.5 MLD Barikala STP is given on dt. 07.09.2024 to M/s R.K. Engineers Sales Ltd. - Khilari Infrastructures (JV). Presently STP site is submerged due to rain water. Presently Dewatering work is in progress. 14-Nov-2024 11:45 AM
44 Mathura Kosi Arterial Channel Barsana Chowk Nagar Panchayat Nala Untapped Drains 0.25 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
45 Rae Bareli Ganga Barudha Ghat ka Nala/(Sherandajpur) Untapped Drains 0.15 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:43 PM
46 Gorakhpur Rapti Basantpur Narkatiya Nalla Untapped Drains 1.76 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
47 Gorakhpur Rohini Basiyadih Nalla Untapped Drains 5.84 Work is in progress under AMRUT. Proposed Date of completion is 31.03.2023 03-Jul-2024 04:54 PM
48 Lalitpur Betwa Bayana Nala Untapped Drains 20.00 Bioremediation is being done by Nagar Palika in dry season. 18-Sep-2024 11:35 AM
49 Azamgarh Tamsa Before Kundanghat Bridge Drain Untapped Drains 0.09 Action to be taken 01-Jul-2024 12:00 AM
50 Azamgarh Tamsa Behind By pass raidarpur drain Untapped Drains 2.25 Action to be taken 01-Jul-2024 12:00 AM
51 Chitrakoot Mandakini Behind Janseva Inter College, Basti Nala, Shankar Bazar, Khatkana Mohalla, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:15 AM
52 Chitrakoot Yamuna Bekal Baba nala Untapped Drains 5.00 Action to be taken 01-Jul-2024 12:00 AM
53 Agra Yamuna Belanganj Bridge Untapped Drains 0.38 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
54 Agra Yamuna Belanganj Kali Mandir Untapped Drains 0.00 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
55 Agra Yamuna Belanganj Police Chowki Untapped Drains 0.21 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
56 Saharanpur Harnandi (Hindon) Below Railway Line Untapped Drains 0.05 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
57 Saharanpur Harnandi (Hindon) Beri Bagh drain Untapped Drains 0.50 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
58 Saharanpur Harnandi (Hindon) Bhagat Singh chowk ke samne Untapped Drains 0.25 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
59 Farrukhabad Ganga Bhairoghat drain Untapped Drains 5.19 Tapping in progress & will be completed by 30.09.2024. Flow of this drain will diverted to 30 MLD STP at Farukhabad. 18-Sep-2024 11:19 AM
60 Agra Yamuna Bhalla ji Wali Drain Untapped Drains 0.01 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
61 Chitrakoot Mandakini Bhauna Nala Tarunha, Chhiptahri, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:18 AM
62 Lakhimpur Kheri Sarayan Bhootnath Nala Untapped Drains 4.67 DPR has been prepared by U.P. Jal Nigam (Urban) in SBM 2.0 and submmited for approval. 01-Jul-2024 12:00 AM
63 Mathura Kosi Arterial Channel Bihari Ji Ka Nala Untapped Drains 0.06 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
64 Saharanpur Harnandi (Hindon) Bijli Ghar Nala Untapped Drains 0.70 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
65 Mahoba NA Boddh Math Nala Untapped Drains 1.24 Discharge of this drain falling to nearby Dariba sewage pond 18-Sep-2024 11:41 AM
66 Saharanpur Harnandi (Hindon) Brahmpuri Drain Untapped Drains 0.11 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
67 Saharanpur Harnandi (Hindon) Braj Transport Nala Untapped Drains 8.73 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
68 Ghazipur Ganga Budenath Mahadew Ghat Drain Untapped Drains 0.80 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
69 Mathura Yamuna Chaitanya Vihar Nala (Sunrakh Nala -1) Untapped Drains 3.34 Proposed to be tapped in 13 MLD STP under I&D and STP project Vrindavan. LoA has been issued 01-Jul-2024 12:00 AM
70 Mathura Yamuna Chaitanya Vihar Nala (Sunrakh Nala -2) Untapped Drains 0.56 Proposed to be tapped in 13 MLD STP under I&D and STP project Vrindavan. LoA has been issued 01-Jul-2024 12:00 AM
71 Moradabad Ram ganga Chandausi Road left side Untapped Drains 0.85 • DPR sent to NMCG vide L.no. 1474/032/SMCG-UP/11 dt 19.12 23 for approval. 35 MLD for Z-3 & 45 MLD 22-May-2024 06:10 PM
72 Chandauli Ganga Chandhasi Nala/Railway Nala Untapped Drains 21.07 Revised DPR sent to SMCG by CE(Ganga) on 13.08.2024. Funds to be allocated for purchase of land 28-Aug-2024 05:53 PM
73 Aligarh Aligarh Drain ( Irrigation ) Chherrat/Lehtoi Drain Untapped Drains 39.50 NMCG provided observations on DPR on 15.01.2024 and reply from CE Ganga sent to SMCG on 06.2.2024. SMCG asked for further clarifications on 04.04.2024. Clarification has been given on 07.06.2024 01-Jul-2024 12:00 AM
74 Saharanpur Harnandi (Hindon) Chilkana Nalla (Dhobi Ghat) Untapped Drains 17.41 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
75 Agra Yamuna Chini Ka Roza - I Untapped Drains 1.03 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
76 Agra Yamuna Chini Ka Roza - II Untapped Drains 0.03 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
77 Ambedkar Nagar Ghaghara Chintora Drain Untapped Drains 2.00 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:41 PM
78 Mirzapur Ganga Chorawa Untapped Drains 0.25 Work in progress. 01-Jul-2024 12:00 AM
79 Mathura Kosi Arterial Channel Chuli Nagla Nala Untapped Drains 0.27 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
80 Ambedkar Nagar Tamsa chuna bhatti ke pass Untapped Drains 3.04 Action to be taken 03-Jul-2024 01:03 PM
81 Azamgarh Tamsa Collectorate Office Nala Untapped Drains 0.35 Action to be taken 01-Jul-2024 12:00 AM
82 Kanpur Nagar Ganga Dabka Nala Untapped Drains 2.14 DPR was submitted to TPA (IIT, R) of NMCG on 18.10.23. Final compliance of DPR was send to TPI in 01.11.23. TPI has submitted its report to NMCG in Nov-23. A meeting of EC, NMCG, New Delhi held on 05-07-2024 in which DG, NMCG directed to conduct a drone survey/joint inspection with concerning departments officials to identify all other additional drains falling to river Ganga and Pandu and send a revised DPR after adding all untapped drains. 18-Sep-2024 11:05 AM
83 Azamgarh Tamsa Dalal ghat Jama masjid Drain Untapped Drains 0.52 Action to be taken 01-Jul-2024 12:00 AM
84 Azamgarh Tamsa Dalalghat Hathiya pul ke Untapped Drains 0.69 Action to be taken 01-Jul-2024 12:00 AM
85 Saharanpur Harnandi (Hindon) Dalmandi Pumping station Untapped Drains 0.44 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
86 PrayagRaj Yamuna Dariyabad Jogighat Drain Meerapur Untapped Drains 0.51 LOA has been issued, contract bond formation is in progress by UPJN(R) under Mahakumbh-2025 01-Jul-2024 12:00 AM
87 PrayagRaj Yamuna Dariyabad Kakahraghat Drain Meerapur Untapped Drains 2.11 To be tapped at proposed 50 MLD STP at Naini, under tendering 01-Jul-2024 12:00 AM
88 PrayagRaj Yamuna Dariyabad Pipalghat Drain Untapped Drains 0.12 To be tapped at proposed 50 MLD STP at Naini, under tendering 01-Jul-2024 12:00 AM
89 Auraiya Yamuna Dayalpur Nala Untapped Drains 5.39 DPR has been sent to SBM, Nideshalaya for approval by UPJN (U) in Feb, 2024 18-Sep-2024 11:33 AM
90 Agra Yamuna Dayanand Ashram Untapped Drains 0.21 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
91 Moradabad Ram ganga Delhi road (L) Untapped Drains 1.05 DPR sent to NMCG vide L.no. 1474/032/SMCG-UP/11 dt 19.12 23 for approval. 35 MLD for Z-3 & 45 MLD Z- 22-May-2024 06:14 PM
92 Moradabad Ram ganga Delhi road(L) Untapped Drains 0.32 • DPR sent to NMCG vide L.no. 1474/032/SMCG-UP/11 dt 19.12 23 for approval. 35 MLD for Z-3 & 45 MLD 01-Jul-2024 12:00 AM
93 Moradabad Ram ganga Delhi road(R) Untapped Drains 1.32 DPR sent to NMCG vide L.no. 1474/032/SMCG-UP/11 dt 19.12 23 for approval. 35 MLD for Z-3 & 45 MLD Z- 01-Jul-2024 12:00 AM
94 Hathras Karvan Dhakpura Drain Untapped Drains 5.50 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
95 Saharanpur Harnandi (Hindon) Dhamola Nadi ka Pul Sapna Takies Untapped Drains 1.09 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
96 Azamgarh Tamsa Dharmu drain Untapped Drains 2.85 Action to be taken 01-Jul-2024 12:00 AM
97 Agra Yamuna Dharwale Baba - I Untapped Drains 0.17 Construction of 1.10 MLD capacity DSTP at Islam Nagar is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
98 Agra Yamuna Dharwale Baba - II Untapped Drains 0.00 Construction of 1.10 MLD capacity DSTP at Islam Nagar is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
99 Sant Ravidas Nagar Varuna Dhaurahara/ Mamdevpur Drain Untapped Drains 5.00 Proposed to tapped 03-Jul-2024 11:03 AM
100 Farrukhabad Ganga Dheemarpur drain Untapped Drains 0.34 Tapping in progress & will be completed by 30.09.2024. Flow of this drain will diverted to 30 MLD STP at Farukhabad. 18-Sep-2024 11:20 AM
101 Sitapur Sarayan Dhobi Ghat Nala Untapped Drains 0.85 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:04 PM
102 Chitrakoot Mandakini Dhobin Ghat drain Tarunha, Deyodhi Tola, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:18 AM
103 Gorakhpur Rapti Domingarh Nalla Untapped Drains 9.03 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
104 Chitrakoot Mandakini Drain in front of Balaji Temple, Purani Bazaar, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:15 AM
105 Chitrakoot Mandakini Drain located at Raja Saheb Ghat, Near Old Bazar Ghus Maidan, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:16 AM
106 PrayagRaj Yamuna Drain near Chachar Nala/Bargad Ghat Meerapur Untapped Drains 0.19 LOA has been issued, contract bond formation is in progress by UPJN(R) under Mahakumbh-2025 01-Jul-2024 12:00 AM
107 Chitrakoot Mandakini Drain next to NH, Purani Bazaar, Karvi (Near Indane Gas Agency) Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:16 AM
108 Mau Ghaghara Drain No. 10 (Ward-10) Untapped Drains 0.29 DPR for construction of FSTP is being prepared as directed by NMCG 01-Jul-2024 12:00 AM
109 Saharanpur Kali West Drain no. 4 Untapped Drains 0.15 DPR submitted on 05.06.2023, IIT Roorkee TPA visit on 09.03.2024. TPAR submitted on 18.03.2024 01-Jul-2024 12:00 AM
110 Mau Ghaghara Drain No. 4 (Ward-4) Untapped Drains 1.76 DPR for construction of FSTP is being prepared as directed by NMCG 01-Jul-2024 12:00 AM
111 Chitrakoot Mandakini Drain towards the temple behind Bethel School, Shankar Bazar, Shankarganj, Mohalla, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:15 AM
112 Pilibhit Gomti Drain-2 Untapped Drains 30.00 tapped to Test STP 09-Sep-2024 11:33 PM
113 Saharanpur Harnandi (Hindon) Dukhi Bagh Untapped Drains 0.06 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
114 Varanasi Varuna Durga Drain Untapped Drains 37.00 DPR for I&D of Durga Drain and STP works, Varanasi has been submitted to NMCG in April 2024. Approva 01-Jul-2024 12:00 AM
115 Mau Ghaghara Durga Mata Mandir drain Untapped Drains 0.09 DPR for construction of FSTP is being prepared as directed by NMCG 01-Jul-2024 12:00 AM
116 Azamgarh Tamsa Durga Talkies Thandi Road ka nala Untapped Drains 0.60 Action to be taken 01-Jul-2024 12:00 AM
117 Sitapur Sarayan Durgapurwa Nala Nai Basti Untapped Drains 0.17 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 01-Jul-2024 12:00 AM
118 Sitapur Sarayan Fat Fata Nala Untapped Drains 0.25 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:05 PM
119 Lucknow Gomti Fazullaiganj Downstream Untapped Drains 0.77 Date of start is given on date 14.06.2024 to M/s R.K. Engineer sales ltd.-Khliari Infrastructures (JV). Construction of Staff Quarter is in progress. BEP for STP is submitted on dt. 12.11.2024, while site of SPS is submerged with rain water and dewatering work is in progress. 14-Nov-2024 11:47 AM
120 Lucknow Gomti Fazullaiganj Upstream Untapped Drains 8.96 Date of start is given on date 14.06.2024 to M/s R.K. Engineer sales ltd.-Khliari Infrastructures (JV). Construction of Staff Quarter is in progress. BEP for STP is submitted on dt. 12.11.2024, while site of SPS is submerged with rain water and dewatering work is in progress. 14-Nov-2024 11:46 AM
121 Ambedkar Nagar Tamsa gadaya Untapped Drains 1.79 Action to be taken 03-Jul-2024 01:07 PM
122 Saharanpur Harnandi (Hindon) Gaddhe Wali Gali Untapped Drains 2.71 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
123 Agra Yamuna Gailana Untapped Drains 0.24 Construction of 3.00 MLD capacity DSTP at Transport Nagar is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
124 Agra Yamuna Gali Amanat Ram Bagichi-I Untapped Drains 0.08 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
125 Agra Yamuna Gali Amanat Ram Bagichi-II Untapped Drains 0.01 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
126 Agra Yamuna Gali Subedar Nagar Untapped Drains 0.15 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
127 Agra Yamuna Ganesh Nagar Untapped Drains 0.24 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
128 Unnao Ganga Ganga Vishnu Drain Untapped Drains 0.10 I&D and STP works at Shuklaganj is ongoing under Namami Gange, likely to be completed by Jan-25 14-Nov-2024 03:37 PM
129 Deoria Ghaghra Gaura Nala-1(near peepal tree) Untapped Drains 0.02 NA 04-Jul-2024 04:15 PM
130 PrayagRaj Yamuna Ghaghar Nala 1-A / Sadiyapur Drain Untapped Drains 0.26 LOA has been issued, contract bond formation is in progress by UPJN(R) under Mahakumbh-2025 01-Jul-2024 12:00 AM
131 PrayagRaj Yamuna Ghaghar Nala 1-A1 Untapped Drains 0.21 LOA has been issued, contract bond formation is in progress by UPJN(R) under Mahakumbh-2025 01-Jul-2024 12:00 AM
132 PrayagRaj Yamuna Ghaghar Nala 1-B / Harshvardhan Drain Untapped Drains 0.10 LOA has been issued, contract bond formation is in progress by UPJN(R) under Mahakumbh-2025 01-Jul-2024 12:00 AM
133 Gorakhpur Rapti Ghasiyari Nalla Untapped Drains 0.30 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
134 Ambedkar Nagar Ghaghara Ghasiyari Tola Untapped Drains 1.30 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:33 PM
135 Mirzapur Ganga Ghoreshahid Drain Untapped Drains 5.00 Work in progress. 01-Jul-2024 12:00 AM
136 Sitapur Sarayan GIC Nala Untapped Drains 1.17 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:15 PM
137 Agra Yamuna Gokul Nagar Untapped Drains 0.39 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
138 Ambedkar Nagar Ghaghara Gola Ghat Untapped Drains 0.26 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:34 PM
139 Kanpur Nagar Ganga Golaghat Nala Untapped Drains 1.79 DPR was submitted to TPA (IIT, R) of NMCG on 18.10.23. Final compliance of DPR was send to TPI in 01.11.23. TPI has submitted its report to NMCG in Nov-23. A meeting of EC, NMCG, New Delhi held on 05-07-2024 in which DG, NMCG directed to conduct a drone survey/joint inspection with concerning departments officials to identify all other additional drains falling to river Ganga and Pandu and send a revised DPR after adding all untapped drains 18-Sep-2024 11:10 AM
140 Lucknow Gomti Gomti Nagar Drain Untapped Drains 22.15 DPR has been submitted to NMCG vide letter no. 1050/0369/SMCG-UP/12 dt. 27.09.2022 for approval. CE (Ganga) again requested to NMCG for approval of DPR on dt.03.06.2024. 19-Oct-2024 12:16 PM
141 Lucknow Gomti Gomti Nagar Extension Drain Untapped Drains 2.07 DPR has been submitted to NMCG vide letter no. 1050/0369/SMCG-UP/12 dt. 27.09.2022 for approval. CE (Ganga) again requested to NMCG for approval of DPR on dt.03.06.2024. 19-Oct-2024 12:17 PM
142 Sitapur Sarayan Gopal Ghat Nala Untapped Drains 0.09 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised. 01-Jul-2024 12:00 AM
143 Ghazipur Ganga Gorawa Drain Untapped Drains 0.60 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
144 PrayagRaj Ganga Govindpur Colony Drain (Purani Basti) Untapped Drains 0.22 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
145 PrayagRaj Ganga Govindpur Colony Drain No. 1 Untapped Drains 0.28 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
146 PrayagRaj Ganga Govindpur Colony Drain No. 2 Untapped Drains 0.32 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
147 PrayagRaj Ganga Govindpur Colony Drain No. 3 Untapped Drains 0.16 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
148 PrayagRaj Ganga Govindpur Colony Drain No. 4 Untapped Drains 0.27 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
149 Azamgarh Tamsa Grand Hospital Nala Untapped Drains 1.21 Action to be taken 01-Jul-2024 12:00 AM
150 Gautam Buddha Nagar Harnandi (Hindon) Greater Noida Drain Untapped Drains 13.00 Industrial Drain. To be taken up by UPPCB. 14-Aug-2024 03:24 PM
151 Gorakhpur Rohini Green City Phase-II Nalla Untapped Drains 1.61 Work is in progress under AMRUT. Proposed Date of completion is 31.03.2023 03-Jul-2024 04:54 PM
152 Azamgarh Tamsa Gulami ka pura masjid k paas Untapped Drains 0.95 Action to be taken 01-Jul-2024 12:00 AM
153 Bulandshahr Kali Gulaothi Drain Untapped Drains 6.91 The DPR has been sanctioned by NMCG in EC meeting on 13.08.2024 28-Aug-2024 03:13 PM
154 Sitapur Sarayan Habib Pur Nala Untapped Drains 0.31 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised. 29-May-2024 05:55 PM
155 Azamgarh Tamsa Hadaha Mandir Ka Nala Untapped Drains 1.38 Action to be taken 01-Jul-2024 12:00 AM
156 Mathura Kosi Arterial Channel Hamir Thok Nala -I Untapped Drains 0.06 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
157 Mathura Kosi Arterial Channel Hamir Thok Nala -II Untapped Drains 0.06 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
158 Mahoba NA Hamirpur Chungi Nala Untapped Drains 2.26 Discharge of this drain falling to nearby Dariba sewage pond 18-Sep-2024 11:43 AM
159 Gorakhpur Rapti Hansupur Nalla Untapped Drains 0.82 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
160 Gorakhpur Ghaghra Hanuman Garhi Nala Untapped Drains 0.06 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:33 PM
161 Mirzapur Ganga Hanumanghat Drain Untapped Drains 0.68 Work in progress. 01-Jul-2024 12:00 AM
162 Hapur Kali Hapur Drain-1 (City drain) Untapped Drains 6.00 LOI issued to M/s Satish Kumar vide SE Lt No. 196/790/10 Dt 24.08.24 28-Aug-2024 02:55 PM
163 Chitrakoot Mandakini Harijan Basti Kailash street drain, Tarouha, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:17 AM
164 Lakhimpur Kheri ULL RIVER Hidayatnagar Drain Untapped Drains 2.70 Originating from Dist Lakhimpur & falls in Ghagra river. 01-Jul-2024 12:00 AM
165 Ghaziabad Harnandi (Hindon) Hindon Vihar Drain Untapped Drains 7.46 Action to be taken 11-Jul-2024 10:48 AM
166 Gorakhpur Rapti Illahibagh Nalla Untapped Drains 20.61 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
167 PrayagRaj Ganga Indira Awas Nala / Jai Gurudev Ashram Nala Untapped Drains 1.19 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
168 Agra Yamuna Indira Memorial Bridge Untapped Drains 0.15 Construction of 1.50 MLD capacity DSTP at Indira memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
169 Unnao Ganga Indira Nagar Drain Untapped Drains 2.80 I&D and STP works at Shuklaganj is ongoing under Namami Gange, likely to be completed by Jan-25 14-Nov-2024 03:37 PM
170 Rae Bareli Sai Indira Nagar Nala Untapped Drains 4.70 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:09 PM
171 Saharanpur Harnandi (Hindon) Indra Basti 1 drain Untapped Drains 0.04 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
172 Saharanpur Harnandi (Hindon) Indra Basti 2 drain Untapped Drains 0.15 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
173 Saharanpur Harnandi (Hindon) Indra Basti 3 drain Untapped Drains 0.18 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
174 Saharanpur Harnandi (Hindon) Indra Camp Untapped Drains 0.44 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
175 Ghaziabad Yamuna Indrapuri Drain Untapped Drains 35.00 ... 11-Jul-2024 10:48 AM
176 Agra Yamuna Islam Nagar Untapped Drains 0.49 Construction of 1.10 MLD capacity DSTP at Islam Nagar is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
177 Auraiya Yamuna Jalaun Road Nala Untapped Drains 11.07 DPR has been sent to SBM, Nideshalaya for approval by UPJN (U) in Feb, 2024 18-Sep-2024 11:33 AM
178 Hathras Karvan Jalesar Road-I Untapped Drains 0.42 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
179 Hathras Karvan Jalesar Road-II Untapped Drains 0.50 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
180 Agra Yamuna Jalma Untapped Drains 0.52 Construction of 0.30 MLD capacity DSTP near Jalma institue is in progress under Agra Sewerage Schem 01-Jul-2024 12:00 AM
181 Barabanki Gomti Jamuriya Drain Untapped Drains 14.00 Action to be taken 05-Jul-2024 11:43 AM
182 Saharanpur Harnandi (Hindon) Janta colony Untapped Drains 0.04 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
183 Agra Yamuna Jaswant Singh Ki Chatri - I Untapped Drains 0.03 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
184 Agra Yamuna Jaswant Singh Ki Chatri - II Untapped Drains 0.02 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
185 Agra Yamuna Jaswant Singh Ki Chatri - III Untapped Drains 0.01 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
186 Mathura Yamuna Jatipura Drain Untapped Drains 0.60 DPR for tapping of said drain is being prepared by UPJN(Urban) under SBM 2.0 . 04-Jul-2024 04:01 PM
187 Ghazipur Ganga Jauhargaj Drain Untapped Drains 0.80 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
188 Saharanpur Harnandi (Hindon) Jawahar Nagar, Khurana Niwas Untapped Drains 1.10 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
189 Saharanpur Harnandi (Hindon) Jogyan Pull near Ganpati cellphone Untapped Drains 0.58 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
190 PrayagRaj Ganga Jondhwal Nala Untapped Drains 6.75 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
191 Azamgarh Tamsa Jyoti Niketan School drain Untapped Drains 1.81 Action to be taken 01-Jul-2024 12:00 AM
192 Agra Yamuna K.K. Nagar Untapped Drains 0.60 Construction of 1.6 MLD capacity DSTP is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
193 Mau Ghaghara Kabristan drain Untapped Drains 0.03 DPR for construction of FSTP is being prepared as directed by NMCG 01-Jul-2024 12:00 AM
194 Deoria Ghaghra Kabristan Nala Untapped Drains 0.85 NA 04-Jul-2024 04:24 PM
195 Agra Yamuna Kailash Mandir Untapped Drains 0.01 Construction of 0.02 MLD capacity DSTP near Kailash Mandir is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
196 Shamli Yamuna Kairana Drain Untapped Drains 10.50 I&D and STP works at Kairana is ongoing under Namami Gange, likely to be completed by June-24. 01-Jul-2024 12:00 AM
197 Ayodhya Saryu Kakrahi Untapped Drains 3.29 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
198 Mathura Yamuna Kala Patthar Nala Untapped Drains 7.64 Proposed to be tapped in 60 MLD STP Gokul Barrage under Mathura Sewerage Scheme. LOA issued. 01-Jul-2024 12:00 AM
199 Azamgarh Tamsa Kaleem Ganj Nala Untapped Drains 0.17 Action to be taken 01-Jul-2024 12:00 AM
200 Chandauli Ganga Kali Mohal Drain (Ganda Nala) Untapped Drains 8.26 Revised DPR sent to SMCG by CE(Ganga) on 13.08.2024. Funds to be allocated for purchase of land. 28-Aug-2024 05:53 PM
201 Mahoba NA Kalyaan Sagar Nala Untapped Drains 2.00 the discharge of kalyaan sagar drain accumulates in Kalyaan Sagar Pond. 18-Sep-2024 11:40 AM
202 Saharanpur Harnandi (Hindon) Kalyani Sales Untapped Drains 0.06 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
203 Agra Yamuna Kamayani Hospital Untapped Drains 0.40 Construction of 1.6 MLD capacity DSTP at KK Nagar is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
204 Gorakhpur Ghaghra Kango Ghat Nala - 1 Untapped Drains 1.83 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:31 PM
205 Gorakhpur Ghaghra Kango Ghat Nala - 2 Untapped Drains 0.10 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:32 PM
206 Chitrakoot Mandakini Kanji House to Shamshan Ghat Road Drain, Sitapur, Chitrakoot Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:19 AM
207 Ghazipur Ganga Kankarwa Drain Untapped Drains 1.01 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
208 Rae Bareli Sai Kanpur Road Nala Untapped Drains 3.20 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:10 PM
209 Saharanpur Harnandi (Hindon) Kapil Vihar Drain Untapped Drains 0.35 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
210 Saharanpur Harnandi (Hindon) Kapil Vihar near OHT Untapped Drains 0.17 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
211 Ghaziabad Harnandi (Hindon) Karheda Drain Untapped Drains 4.72 DPR for I&D and STP (68 MLD) has been sanctioned in AMRUT 2.0 11-Jul-2024 10:45 AM
212 Banda Ken Kariya Nala Untapped Drains 6.06 Bio remediation treatment is being done by Nagar Palika, Banda 14-Aug-2024 05:41 PM
213 Ghazipur Ganga Karpurimai Ghat Drain Untapped Drains 2.80 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
214 Moradabad Ram ganga Karula drain Untapped Drains 32.00 • DPR sent to NMCG vide L.no. 1474/032/SMCG-UP/11 dt 19.12 23 for approval. 35 MLD for Z-3 & 45 MLD 22-May-2024 06:05 PM
215 Gorakhpur Rapti Kataniya / Mahewa Nalla Untapped Drains 8.91 To be taken up under AMRUT-II. DPR has been approved in SLTC meeting dt. 10.08.2022 and approved in SHPSC dt. 30.08.2022. GO awaited. 03-Jul-2024 05:12 PM
216 Ballia Ganga Kathalr Nala Untapped Drains 12.10 STP proposed to be completed in May 2025 01-Jul-2024 12:00 AM
217 Agra Yamuna Katra Wazir Khan - I Untapped Drains 0.02 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
218 Agra Yamuna Katra Wazir Khan - II Untapped Drains 0.01 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
219 Muzaffarnagar Kali West Khadarwala (Nala no-3) Untapped Drains 5.41 I&D and STP works at Muzaffarnagar is ongoing under Namami Gange, likely to be completed by Jun-24. 01-Jul-2024 12:00 AM
220 Agra Yamuna Khairati Tola Untapped Drains 1.36 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
221 Azamgarh Tamsa Khairatpur Nala Untapped Drains 0.43 Action to be taken 01-Jul-2024 12:00 AM
222 Hamirpur Betwa Khalepur Nala Untapped Drains 0.70 DPR for I&D of these drains has been sent to SBM, Nideshalaya for approval by UPJN(U) in Oct, 2023. 18-Sep-2024 11:32 AM
223 Kanpur Dehat Yamuna Kharja Nahar Nala Untapped Drains 4.61 DPR for I&D works of this drain has been sent to AMRUT Nideshalaya by UPJN(U). 18-Sep-2024 11:43 AM
224 Agra Yamuna Khemchand Tofee factory Untapped Drains 0.03 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
225 Saharanpur Harnandi (Hindon) Khumran Pul Mandi ky Pass Untapped Drains 0.75 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
226 Saharanpur Harnandi (Hindon) Khumran Pul Rikshaw Stand Untapped Drains 0.50 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
227 Ayodhya Saryu Khurdabad A Untapped Drains 1.60 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
228 Ayodhya Saryu Khurdabad B Untapped Drains 0.19 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
229 Bulandshahr Kali Khurja Drain Untapped Drains 14.00 Action to be taken 04-Jul-2024 01:37 PM
230 Mahoba NA Kirat Sagar Nala Untapped Drains 2.00 the discharge of kirat sagar drain accumulates in Kirat Sagar Pond. 18-Sep-2024 11:40 AM
231 Saharanpur Kali West Kola Basti Drain Untapped Drains 0.50 DPR submitted on 05.06.2023, IIT Roorkee TPA visit on 09.03.2024. TPAR submitted on 18.03.2024 01-Jul-2024 12:00 AM
232 Azamgarh Tamsa Kolghat roadways laldiggi Nala Untapped Drains 2.42 Action to be taken 01-Jul-2024 12:00 AM
233 Ghazipur Ganga Kot Ghat Untapped Drains 0.90 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
234 Saharanpur Harnandi (Hindon) Kotwali Nala (left side of Paondhoi) Untapped Drains 0.45 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
235 Muzaffarnagar Kali West Krishnapuri (Nala no.-4) Untapped Drains 16.83 I&D and STP works at Muzaffarnagar is ongoing under Namami Gange, likely to be completed by Jun-24. 01-Jul-2024 12:00 AM
236 Kaushambi Ganga Kubri Ghat-1 Untapped Drains 0.40 Work is proposed in SBM 2.0 by UPJN (Urban) 16-Aug-2024 11:29 AM
237 Kaushambi Ganga Kubri Ghat-2 Untapped Drains 0.10 Work is proposed in SBM 2.0 by UPJN (Urban) 16-Aug-2024 11:29 AM
238 Deoria Ghaghra Kuti Ghat Nala(Azad Nagar South) Untapped Drains 0.04 NA 04-Jul-2024 04:11 PM
239 Gorakhpur Ghaghra Kutiya Mohalla Nala Untapped Drains 1.03 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:33 PM
240 Saharanpur Kali West Kutti Rorad Drain Untapped Drains 9.00 DPR submitted on 05.06.2023, IIT Roorkee TPA visit on 09.03.2024. TPAR submitted on 18.03.2024 01-Jul-2024 12:00 AM
241 Rae Bareli Sai Lohanipur Rewatiram Talab Untapped Drains 1.90 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:09 PM
242 Agra Yamuna Lohia Nagar Untapped Drains 0.38 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
243 Agra Yamuna Lohia Nagar Bankey Bihari Bagichi Untapped Drains 0.10 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
244 Agra Yamuna Lohia Nagar Rathor Wali Gali Untapped Drains 0.19 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
245 Sitapur Sarayan Loniyan Purwa Purvi Nala (Near KainchiPull) Untapped Drains 0.23 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised. 01-Jul-2024 12:00 AM
246 Saharanpur Harnandi (Hindon) Macchali Bazar Untapped Drains 0.61 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
247 Sitapur Sarayan Machhali Mandi ka pakka nala Untapped Drains 0.74 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:14 PM
248 Ambedkar Nagar Ghaghara Machriawa Untapped Drains 1.57 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:35 PM
249 PrayagRaj Yamuna Madauka drain Untapped Drains 0.00 Flow is expected in future, Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
250 Rae Bareli Sai Mahanandapur Nala Untapped Drains 7.40 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:09 PM
251 Ghazipur Ganga Mahaveer Ghat Drain Untapped Drains 0.60 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
252 Lucknow Gomti Maheshganj Untapped Drains 8.22 Date of start is given on date 14.06.2024 to M/s R.K. Engineer sales ltd.-Khliari Infrastructures (JV). Construction of Staff Quarter is in progress. BEP for STP is submitted on dt. 12.11.2024, while site of SPS is submerged with rain water and dewatering work is in progress. 14-Nov-2024 11:47 AM
253 Gorakhpur Rohini Mahesra Mohripur Nalla Untapped Drains 5.01 D.P.R. for “Gorakhpur Sewerage Scheme Zone-C, Part-2” amounting Rs. 566.15 Cr has been sanctioned under AMRUT 2.0. GO is awaited. 03-Jul-2024 04:55 PM
254 PrayagRaj Yamuna Mahewa Pasi Tola Drain No. 1 Untapped Drains 0.72 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
255 PrayagRaj Yamuna Mahewa Pasi Tola Drain No. 2 Untapped Drains 0.41 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
256 PrayagRaj Yamuna Mahewa Pasi Tola Drain No. 3 Untapped Drains 0.62 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
257 PrayagRaj Yamuna Mahewa Pasi Tola Drain No. 4 Untapped Drains 0.31 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
258 PrayagRaj Yamuna Mahewa Pasi Tola Drain No. 5 Untapped Drains 0.41 Work is under progress by U.P.J.N (Rural) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
259 Deoria Ghaghra Main Bazar Nala Untapped Drains 1.60 NA 04-Jul-2024 04:25 PM
260 Mahoba NA Malakpura Drain Untapped Drains 1.13 Discharge of this drain falling to nearby Dariba sewage pond 18-Sep-2024 11:41 AM
261 Deoria Ghaghra Malang Baba Nala(Gaura) Untapped Drains 0.00 discharge-.004MLD 04-Jul-2024 04:16 PM
262 Pratapgarh Ganga Mallahan tola drain (Manikpur Nagar Panchayat) Untapped Drains 0.09 DPR Preparation is being done by U.P.J.N (Urban) under SBM 2.0 01-Jul-2024 12:00 AM
263 Sonbhadra Sone Mallahi Tola Drain Near Bajarang Ghat Untapped Drains 1.70 As per Information provided by NP-Chopan 18-Jul-2024 12:09 PM
264 Sonbhadra Sone Mallahi Tola-1 Untapped Drains 1.70 As per information provided by NP-Chopan 26-Jul-2024 06:36 PM
265 Hathras Karvan Mandi Samiti Drain Untapped Drains 3.12 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
266 Ayodhya Saryu Manja Gaon Untapped Drains 0.10 Will be tapped at 33 MLD Ayodhya STP 31-May-2024 01:32 PM
267 Sitapur Sarayan Manni Chauraha Nala Untapped Drains 2.06 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised. 01-Jul-2024 12:00 AM
268 Unnao Ganga Manohar Nagar Nala IInd (New) Untapped Drains 0.57 I&D and STP works at Shuklaganj is ongoing under Namami Gange, likely to be completed by Jan-25 14-Nov-2024 03:38 PM
269 Unnao Ganga Manohar Nagar Nala Ist (New) Untapped Drains 0.63 I&D and STP works at Shuklaganj is ongoing under Namami Gange, likely to be completed by Jan-25 14-Nov-2024 03:37 PM
270 Agra Yamuna Manoharpura Untapped Drains 1.31 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
271 Kanpur Nagar Ganga Massacre Drain Untapped Drains 1.10 DPR was submitted to TPA (IIT, R) of NMCG on 18.10.23. Final compliance of DPR was send to TPI in 01.11.23. TPI has submitted its report to NMCG in Nov-23. A meeting of EC, NMCG, New Delhi held on 05-07-2024 in which DG, NMCG directed to conduct a drone survey/joint inspection with concerning departments officials to identify all other additional drains falling to river Ganga and Pandu and send a revised DPR after adding all untapped drains 18-Sep-2024 11:12 AM
272 Agra Yamuna Mau Nala - I Untapped Drains 0.11 Construction of 1.13 MLD capacity DSTP at Mau is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
273 Agra Yamuna Mau Nala - II Untapped Drains 0.58 Construction of 1.13 MLD capacity DSTP at Mau is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
274 Ghaziabad Harnandi (Hindon) Meerut Road/ Kailabhatta Drain Untapped Drains 25.31 A PFR, amounting Rs. 440.68 cr. has been submitted under Smart City Programme for I&D and STP (60 and 77 MLD) 11-Jul-2024 10:49 AM
275 Ambedkar Nagar Tamsa mehrotra petrol pump Untapped Drains 6.49 Action to be taken 03-Jul-2024 01:22 PM
276 Ayodhya Saryu Mehtab Baag A Untapped Drains 1.08 Will be tapped at 33 MLD Ayodhya STP 31-May-2024 01:30 PM
277 Ayodhya Saryu Mehtab Baag B Untapped Drains 0.10 Will be tapped at 33 MLD Ayodhya STP 31-May-2024 01:31 PM
278 Ayodhya Saryu Mehtab Baag C Untapped Drains 0.35 Will be tapped at 33 MLD Ayodhya STP 31-May-2024 01:32 PM
279 Gorakhpur Rapti Mirzapur Nalla Untapped Drains 3.28 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
280 Ambedkar Nagar Ghaghara Mishra Ji boundry wall Drain Untapped Drains 1.90 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:38 PM
281 Moradabad Ram ganga MIT Drain Untapped Drains 7.50 To be tapped to 25 MLD STP. work is under progress. 01-Jul-2024 12:00 AM
282 Lakhimpur Kheri Sarayan Mohammadi Drain Untapped Drains 0.29 DPR has been prepared by U.P. Jal Nigam (Urban) in SBM 2.0 and submmited for approval. 01-Jul-2024 12:00 AM
283 Moradabad Ram ganga Moksh Dham Drain Untapped Drains 6.50 To be tapped to 25 MLD STP. work is under progress. 01-Jul-2024 12:00 AM
284 Agra Yamuna Moti Mahal - 1 Untapped Drains 0.04 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
285 Agra Yamuna Moti Mahal - 2 Untapped Drains 0.05 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
286 Agra Yamuna Moti Mahal - 3 Untapped Drains 0.01 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
287 Agra Yamuna Moti Mahal - 4 Untapped Drains 0.12 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
288 Agra Yamuna Moti Mahal - 5 Untapped Drains 0.03 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
289 Agra Yamuna Moti Mahal - 6 Untapped Drains 0.00 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
290 Agra Yamuna Moti Mahal - 7 Untapped Drains 0.27 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
291 Agra Yamuna Moti Mahal - 8 Untapped Drains 0.20 Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
292 Mau Ghaghara Mukti dham drain Untapped Drains 0.04 DPR for construction of FSTP is being prepared as directed by NMCG 01-Jul-2024 12:00 AM
293 Deoria Ghaghra Mukti Dham Nala Untapped Drains 0.93 NA 04-Jul-2024 04:02 PM
294 Gorakhpur Ghaghra Muktipath Nala Untapped Drains 0.38 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:34 PM
295 Gorakhpur Ghaghra Muktipath Near Bridge Nala Untapped Drains 0.09 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:33 PM
296 Rae Bareli Ganga Muskatpal Nala Untapped Drains 0.03 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:44 PM
297 Chitrakoot Mandakini Naavghat drain, Near Old Bazar Ghus Maidan, Naavghat, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:16 AM
298 Hathras Karvan Nagla Khan Drain Untapped Drains 0.19 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
299 Mathura Kosi Arterial Channel Nagla Thok Paigam road Nala -I Untapped Drains 0.07 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
300 Mathura Kosi Arterial Channel Nagla Thok Paigam road Nala -II Untapped Drains 0.32 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
301 Mathura Kosi Arterial Channel Nagla Thok pul Nala Untapped Drains 0.11 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progressss 01-Jul-2024 12:00 AM
302 Mathura Kosi Arterial Channel Nagla Thok Pul Paar Nala Untapped Drains 0.06 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
303 Muzaffarnagar Kali West Nai Basti Khalapar (Nala no.-5) Untapped Drains 2.08 I&D and STP works at Muzaffarnagar is ongoing under Namami Gange, likely to be completed by Jun-24 01-Jul-2024 12:00 AM
304 Saharanpur Harnandi (Hindon) Nai Basti-1 Untapped Drains 0.03 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
305 Saharanpur Harnandi (Hindon) Nai Basti-2 Untapped Drains 0.26 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
306 Sant Ravidas Nagar Varuna Nai Bazaar Drain Untapped Drains 6.50 Proposed to tapped 01-Jul-2024 12:00 AM
307 Saharanpur Harnandi (Hindon) Najir pura Untapped Drains 0.03 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
308 Sitapur Sarayan Nala at Gadiyana - I Untapped Drains 0.03 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:07 PM
309 Sitapur Sarayan Nala at Gadiyana - II Untapped Drains 0.08 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:13 PM
310 Sitapur Sarayan Nala at Gadiyana - III Untapped Drains 0.15 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:14 PM
311 Sitapur Sarayan Nala At Pakka Pul Untapped Drains 0.59 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:14 PM
312 Sitapur Sarayan Nala At Saint Bilal School Untapped Drains 0.15 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 01-Jul-2024 12:00 AM
313 Rae Bareli Ganga Nala between Bada Math - Chhota Math Untapped Drains 0.05 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:44 PM
314 Chitrakoot Mandakini Nala in front of Islamia School, Tarunha, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:17 AM
315 Sitapur Sarayan Nala Near Kaichi Pul Uttar Purwa Butsganj Untapped Drains 0.13 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:14 PM
316 Sitapur Sarayan Nala Near Kaichipul -II Untapped Drains 0.25 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised. 01-Jul-2024 12:00 AM
317 Sitapur Sarayan Nala Near Sai Baba Mandir Untapped Drains 1.57 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:02 PM
318 Saharanpur Harnandi (Hindon) Nalla Near Irrigation Land Untapped Drains 0.04 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
319 Saharanpur Harnandi (Hindon) Nand Vatika Untapped Drains 0.23 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
320 Saharanpur Harnandi (Hindon) Nand Vihar-1 Untapped Drains 0.17 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
321 Saharanpur Harnandi (Hindon) Nand Vihar-2 Untapped Drains 0.01 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
322 Azamgarh Tamsa Narauli Ka Nala (Pahle) Untapped Drains 1.12 Action to be taken 01-Jul-2024 12:00 AM
323 Azamgarh Tamsa Narauli U/S drain Untapped Drains 0.17 Action to be taken 01-Jul-2024 12:00 AM
324 Azamgarh Tamsa Narauli U/S drain Untapped Drains 0.09 Action to be taken 01-Jul-2024 12:00 AM
325 Deoria Ghaghra Nardeshwar Ghat Nala(Gaura) Untapped Drains 0.01 NA 04-Jul-2024 04:14 PM
326 Saharanpur Harnandi (Hindon) Natraj Drycliners Untapped Drains 0.45 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
327 Saharanpur Harnandi (Hindon) Navyug Market Untapped Drains 0.17 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
328 Hathras Karvan Naya Bans Drain Untapped Drains 0.17 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
329 Shamli Krishni Near Bada Buda Talab (Drain No. 01) Untapped Drains 1.40 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
330 Chitrakoot Mandakini Near Brahmacharya School, Sathe Road, Kuberganj, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:14 AM
331 Shamli Krishni Near bus stand at Charthawal Road (Drain No. 04) Untapped Drains 3.20 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
332 Azamgarh Tamsa Near DAV Degree college Drain Untapped Drains 0.35 Action to be taken 01-Jul-2024 12:00 AM
333 Shamli Krishni Near dumping site (Drain No. 05) Untapped Drains 0.50 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
334 Saharanpur Harnandi (Hindon) Near Janak Hotel Untapped Drains 1.00 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
335 Saharanpur Harnandi (Hindon) Near Janak Nagar Untapped Drains 0.62 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
336 Shamli Krishni Near Karaunda Road (Drain No. 02) Untapped Drains 1.60 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
337 Shamli Krishni Near Krishni River Overbridge (Drain No. 03) Untapped Drains 0.20 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
338 Shamli Krishni Near Muzaffarnagar Road (Drain No. 01) Untapped Drains 1.01 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
339 Saharanpur Harnandi (Hindon) Near Police ground behind STP Untapped Drains 0.70 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
340 Shamli Krishni Near Shamli Adda (Drain No. 02) Untapped Drains 1.40 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
341 Shamli Krishni Near Shamshanghat (Drain No. 03) Untapped Drains 0.46 Under Tendering, TBER submitted to NMCG on dated 06.05.2024 01-Jul-2024 12:00 AM
342 Saharanpur Harnandi (Hindon) Near Taj Nala Untapped Drains 0.13 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
343 PrayagRaj Ganga Nehru Park Nala Untapped Drains 2.72 Work is under progress by U.P.J.N (Urban) under Mahakumbh - 2025 01-Jul-2024 12:00 AM
344 Saharanpur Harnandi (Hindon) New Gopal Nagar-1 Untapped Drains 0.26 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
345 Saharanpur Harnandi (Hindon) New Gopal Nagar-2 Untapped Drains 0.09 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
346 Agra Yamuna New Radha Nagar Untapped Drains 0.06 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
347 Agra Yamuna New Radha Nagar Untapped Drains 0.05 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
348 Banda Ken Nimni Nala Untapped Drains 10.44 Bio remediation treatment is being done by Nagar Palika, Banda 18-Sep-2024 11:44 AM
349 Azamgarh Tamsa Nirankari Bhawan Nala Untapped Drains 1.64 Action to be taken 01-Jul-2024 12:00 AM
350 Ayodhya Saryu Nirmalikund Drain Untapped Drains 2.50 I&D work for this drain is being done by UPJN (Urban) 01-Jul-2024 12:00 AM
351 Bulandshahr Kali Nizampur Drain Untapped Drains 10.00 Action to be taken 04-Jul-2024 01:37 PM
352 Gautam Buddha Nagar Harnandi (Hindon) Noida Drain Untapped Drains 15.00 Industrial Drain. To be taken up by UPPCB. 14-Aug-2024 03:23 PM
353 Lakhimpur Kheri Sarayan Noori Masjid drain Untapped Drains 0.08 DPR has been prepared by U.P. Jal Nigam (Urban) in SBM 2.0 and submmited for approval. 01-Jul-2024 12:00 AM
354 Saharanpur Harnandi (Hindon) Numaish camp V-Shape Untapped Drains 0.70 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
355 Saharanpur Harnandi (Hindon) Numish camp Untapped Drains 0.50 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
356 Agra Yamuna Nursery Mandir - I Untapped Drains 0.07 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
357 Agra Yamuna Nursery Mandir - II Untapped Drains 0.01 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
358 Saharanpur Harnandi (Hindon) Old Police Chowki Nala Untapped Drains 0.08 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
359 Saharanpur Harnandi (Hindon) Opposite RamTirath school drain Untapped Drains 0.58 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
360 Rae Bareli Ganga Padva Nala/(Muraibagh) Shankar Nagar Untapped Drains 1.20 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:44 PM
361 Ghazipur Ganga Pakka Ghat Drain Untapped Drains 0.50 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
362 Farrukhabad Ganga Pakkapul Untapped Drains 9.23 Tapping in progress & will be completed by 30.09.2024. Flow of this drain will diverted to 30 MLD STP at Farukhabad. 18-Sep-2024 11:20 AM
363 Saharanpur Harnandi (Hindon) Paondhoi Right Side- From Dhobi Ghat IPS Untapped Drains 3.57 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
364 Mahoba NA Parmanand Nala Untapped Drains 0.41 Discharge of this drain falling to nearby Dariba sewage pond 18-Sep-2024 11:42 AM
365 Hamirpur Yamuna Pataleshwar Nala Untapped Drains 1.40 DPR for I&D of these drains has been sent to SBM, Nideshalaya for approval by UPJN(U) in Oct, 2023. 19-Sep-2024 11:49 AM
366 Deoria Ghaghra Patel Nagar Nala Untapped Drains 0.04 NA 04-Jul-2024 04:03 PM
367 Ayodhya Saryu Pathan Tholiya D Untapped Drains 0.12 Will be tapped at 33 MLD Ayodhya STP 31-May-2024 01:29 PM
368 Ayodhya Saryu Pathantolia A Untapped Drains 12.68 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
369 Ayodhya Saryu Pathantolia B Untapped Drains 0.18 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
370 Ayodhya Saryu Pathantolia C Untapped Drains 0.15 Will be tapped at 33 MLD Ayodhya STP 01-Jul-2024 12:00 AM
371 Rae Bareli Ganga Pathvari Ghat ka Nala/(Tikaitganj) Untapped Drains 0.23 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:44 PM
372 Agra Yamuna Peeli Pokhar Untapped Drains 0.19 Construction of 0.25 MLD capacity DSTP at Poiya village is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
373 Kanpur Nagar Pandu Pipauri Nala Untapped Drains 1.50 Bio remediation treatment is being done by Kanpur Nagar Nigam. 18-Sep-2024 11:46 AM
374 Agra Yamuna Poia Ghat - I Untapped Drains 0.34 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
375 Agra Yamuna Poia Ghat - II Untapped Drains 0.01 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
376 Rae Bareli Sai Police Line Nala Untapped Drains 5.50 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:08 PM
377 Ghaziabad Harnandi (Hindon) Pratap Vihar Drain Untapped Drains 32.16 A PFR, amounting Rs. 440.68 cr. has been submitted under Smart City Programme for I&D and STP (60 and 77 MLD) 11-Jul-2024 10:49 AM
378 Ambedkar Nagar Ghaghara Primary School Untapped Drains 0.23 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:38 PM
379 Saharanpur Harnandi (Hindon) Punjabi Bhag-1 Untapped Drains 0.30 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
380 Saharanpur Harnandi (Hindon) Punjabi Bhag-2 Untapped Drains 0.90 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
381 Saharanpur Harnandi (Hindon) Pushpanjali Vihar Nala Untapped Drains 0.05 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
382 Lucknow Sai Qila Mohammadi Drain Untapped Drains 54.78 Financial Bid Open on dt. 26.10.2024. Financial Bid Evaluation is in progress. 30-Oct-2024 01:56 PM
383 Hathras Karvan R.T.O. Drain Untapped Drains 0.10 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
384 Agra Yamuna Radha Nagar Untapped Drains 0.31 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
385 Saharanpur Harnandi (Hindon) Radha vihar Untapped Drains 0.87 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
386 Azamgarh Tamsa Rahul Nagar Madya ka Nala Untapped Drains 1.55 Action to be taken 01-Jul-2024 12:00 AM
387 Ghaziabad Harnandi (Hindon) Rahul Vihar Drain Untapped Drains 5.26 A PFR, amounting Rs. 440.68 cr. has been submitted under Smart City Programme for I&D and STP (60 and 77 MLD) 11-Jul-2024 10:45 AM
388 Unnao Ganga Railway Bridge Drain Untapped Drains 0.56 I&D and STP works at Shuklaganj is ongoing under Namami Gange, likely to be completed by Jan-25 14-Nov-2024 03:37 PM
389 Pratapgarh Ganga Raja Hela Nala (Prathmik Nala) (Manikpur Nagar Panchayat) Untapped Drains 0.61 DPR Preparation is being done by U.P.J.N (Urban) under SBM 2.0 01-Jul-2024 12:00 AM
390 Rae Bareli Ganga Raja Tiloi Ghat Nala( Gaora Ghat) Untapped Drains 0.15 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:45 PM
391 PrayagRaj Ganga Rajapur Nala Untapped Drains 27.17 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
392 Rae Bareli Sai Rajghat Nala Untapped Drains 7.80 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:08 PM
393 Pratapgarh Ganga Rajghat Nala (Post office Nala) (Manikpur Nagar Panchayat) Untapped Drains 0.26 DPR Preparation is being done by U.P.J.N (Urban) under SBM 2.0 01-Jul-2024 12:00 AM
394 Chitrakoot Mandakini Rajghata Ghat's drain Taronha, Rajghata Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:18 AM
395 Sant Ravidas Nagar Morwa Rajpura Drain Untapped Drains 3.40 Proposed to tapped 01-Jul-2024 12:00 AM
396 Agra Yamuna Rambagh - III Untapped Drains 0.78 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
397 Chitrakoot Mandakini Rambagh Akhada Wala Nala, Taronha, Rambagh Akhada, Karvi Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:18 AM
398 Hamirpur Betwa Ramedi Nala Untapped Drains 2.10 DPR for I&D of these drains has been sent to SBM, Nideshalaya for approval by UPJN(U) in Oct, 2023. 19-Sep-2024 11:50 AM
399 Kanpur Nagar Ganga Rameshwar drain Untapped Drains 2.94 DPR was submitted to TPA (IIT, R) of NMCG on 18.10.23. Final compliance of DPR was send to TPI in 01.11.23. TPI has submitted its report to NMCG in Nov-23. A meeting of EC, NMCG, New Delhi held on 05-07-2024 in which DG, NMCG directed to conduct a drone survey/joint inspection with concerning departments officials to identify all other additional drains falling to river Ganga and Pandu and send a revised DPR after adding all untapped drains. 18-Sep-2024 11:13 AM
400 Ghazipur Ganga Rangmahal Ghat Drain Untapped Drains 0.20 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
401 Kanpur Nagar Ganga Ranighat drain Untapped Drains 2.39 DPR was submitted to TPA (IIT, R) of NMCG on 18.10.23. Final compliance of DPR was send to TPI in 01.11.23. TPI has submitted its report to NMCG in Nov-23. A meeting of EC, NMCG, New Delhi held on 05-07-2024 in which DG, NMCG directed to conduct a drone survey/joint inspection with concerning departments officials to identify all other additional drains falling to river Ganga and Pandu and send a revised DPR after adding all untapped drains 18-Sep-2024 11:10 AM
402 Unnao Ganga Ravidas Nagar Nala (New) Untapped Drains 1.30 DPR to be prepared by UPJN Urban in SBM 2.0 14-Nov-2024 03:38 PM
403 Jalaun Yamuna Rayda divara nala Untapped Drains 8.43 DPR for I&D works send to NMCG by SMCG on 03/20. No communication recieved from NMCG yet.. 19-Sep-2024 11:41 AM
404 Ayodhya Saryu Retiya Untapped Drains 2.03 Will be tapped at 33 MLD Ayodhya STP 31-May-2024 12:11 PM
405 Sitapur Sarayan Roti Godam Ram nagar Nala Untapped Drains 1.92 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 28-Aug-2024 07:15 PM
406 PrayagRaj Ganga Sadar Bazar Nala Untapped Drains 4.79 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
407 Kanpur Nagar Pandu Sagarpuri Nala Untapped Drains 3.00 Bio remediation treatment is being done by Kanpur Nagar Nigam. 18-Sep-2024 11:46 AM
408 Lucknow Gomti Sahara City Drain Untapped Drains 7.59 DPR has been submitted to NMCG vide letter no. 1050/0369/SMCG-UP/12 dt. 27.09.2022 for approval. CE (Ganga) again requested to NMCG for approval of DPR on dt.03.06.2024. 19-Oct-2024 12:17 PM
409 Agra Yamuna Sakseria Drain Untapped Drains 1.91 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
410 Lakhimpur Kheri ULL RIVER salempur kon Drain Untapped Drains 1.50 Originating from Dist Lakhimpur & falls in Ghagra river. 01-Jul-2024 12:00 AM
411 Ghazipur Ganga Sangat Ghat Drain Untapped Drains 0.50 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
412 Deoria Ghaghra Sant Ravidas Ghat Nala(Patel Nagar East) Untapped Drains 0.27 NA 04-Jul-2024 04:04 PM
413 Pratapgarh Ganga Saraswati ghat nala (Pakka nala) (Manikpur Nagar Panchayat) Untapped Drains 0.60 DPR Preparation is being done by U.P.J.N (Urban) under SBM 2.0 01-Jul-2024 12:00 AM
414 Chitrakoot Mandakini Saryu Nala Sitapur, Chitrakoot Untapped Drains 0.00 Fund demand has been send to Head Quarter for flow measurement 16-Aug-2024 11:19 AM
415 Kanpur Nagar Ganga Satti Chaura Untapped Drains 1.37 DPR was submitted to TPA (IIT, R) of NMCG on 18.10.23. Final compliance of DPR was send to TPI in 01.11.23. TPI has submitted its report to NMCG in Nov-23. A meeting of EC, NMCG, New Delhi held on 05-07-2024 in which DG, NMCG directed to conduct a drone survey/joint inspection with concerning departments officials to identify all other additional drains falling to river Ganga and Pandu and send a revised DPR after adding all untapped drains 18-Sep-2024 11:11 AM
416 Lakhimpur Kheri ULL RIVER Sethghat Drain Untapped Drains 3.80 Originating from Dist Lakhimpur & falls in Ghagra river. 01-Jul-2024 12:00 AM
417 Mathura Kosi Arterial Channel Sewage farm drain, Kosi Untapped Drains 5.64 Proposed to be tapped in 12 MLD STP under I&D and STP work project. Tendering under progress 01-Jul-2024 12:00 AM
418 Agra Yamuna Shambhunath J.H. School Untapped Drains 0.02 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
419 Shamli Krishni Shamli Nala Untapped Drains 20.10 Under Tendering, Price BER submitted to NMCG on dated 03.04.2024 01-Jul-2024 12:00 AM
420 PrayagRaj Ganga Shankarghat Colony Drain (Near Phaphamau Bridge) Untapped Drains 0.95 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
421 PrayagRaj Ganga Shankarghat Drain -01 Untapped Drains 0.44 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
422 PrayagRaj Ganga Shankarghat Drain -02 Untapped Drains 0.95 Will be tapped at 90 MLD Rajapur STP which is under tendering 01-Jul-2024 12:00 AM
423 Saharanpur Harnandi (Hindon) Shanti Nagar-1 Untapped Drains 0.02 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
424 Saharanpur Harnandi (Hindon) Shanti Nagar-2 Untapped Drains 0.26 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
425 Saharanpur Harnandi (Hindon) Sharab Theka ky Samny Untapped Drains 0.73 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
426 Mathura Kosi Arterial Channel Sher Garh road Nala - I Untapped Drains 0.47 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
427 Mathura Kosi Arterial Channel Sher Garh road Nala - II Untapped Drains 0.14 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
428 Saharanpur Harnandi (Hindon) Shiv Bagula Mukhi Untapped Drains 0.35 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
429 Azamgarh Tamsa Shiv mandir saray, Mandraj, pallini Untapped Drains 1.30 Action to be taken 01-Jul-2024 12:00 AM
430 Rae Bareli Ganga Shivala Ghat Nala Untapped Drains 0.03 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:45 PM
431 Ambedkar Nagar Tamsa shivalay ghat Untapped Drains 5.05 Action to be taken 03-Jul-2024 01:04 PM
432 PrayagRaj Ganga Shivkuti Drain No. 1 Untapped Drains 1.19 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
433 PrayagRaj Ganga Shivkuti Drain No. 2 Untapped Drains 0.16 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
434 PrayagRaj Ganga Shivkuti Drain No. 3 (North) Untapped Drains 0.22 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
435 PrayagRaj Ganga Shivkuti Drain No. 4 Untapped Drains 0.28 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
436 PrayagRaj Ganga Shivkuti Drain No. 5 Untapped Drains 0.32 To be tapped in on going project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
437 PrayagRaj Ganga Shivkuti Drain No. 6 Untapped Drains 0.28 To be tapped in on going project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
438 PrayagRaj Ganga Shivkuti Drain No. 7 (East) Untapped Drains 0.77 To be tapped in ongoing project of 43 MLD Salori STP 01-Jul-2024 12:00 AM
439 Rae Bareli Ganga Shukla Ghat ka Nala/(Sherandajpur) Untapped Drains 0.05 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:45 PM
440 Agra Yamuna Shyam Lal Vidya Mandir Untapped Drains 0.14 DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 01-Jul-2024 12:00 AM
441 Azamgarh Tamsa Sidhari Nala Purana Pul Untapped Drains 0.52 Action to be taken 01-Jul-2024 12:00 AM
442 Mathura Kosi Arterial Channel Sigu Thok Raman Bagichi Nala Untapped Drains 0.15 Proposed to be tapped in 6 MLD STP under Chhata town sewerage scheme. Tendering under progress 01-Jul-2024 12:00 AM
443 Sitapur Sarayan Slaughter House Nala Untapped Drains 1.29 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised . 01-Jul-2024 12:00 AM
444 Rae Bareli Ganga Soarakh Ghat Muroop Nala/(Tikaitganj) Untapped Drains 0.23 AA &ES for 08 KLD FSTP at Dalmau, Raebareli has been issued by NMCG on dt. 28.08.2024. 18-Sep-2024 03:46 PM
445 Deoria Ghaghra Sonwa Mandir Nala(Azad Nagar South) Untapped Drains 0.01 NA 04-Jul-2024 04:05 PM
446 Deoria Ghaghra Sri Ram Singh ka Nala(Gaura) Untapped Drains 0.01 NA 04-Jul-2024 04:12 PM
447 Unnao Ganga Srinagar Drain Untapped Drains 6.00 DPR to be prepared by UPJN Urban in SBM 2.0 14-Nov-2024 03:38 PM
448 Ambedkar Nagar Ghaghara State Bank Drain Untapped Drains 2.05 DPR submitted to NMCG vide letter dated 31.03.2022. Observations intimated by NMCG vide letter dated 18.05.2022. Revised DPR was submitted to SMCG vide letter no. 420/012-0272(18)/2022 dated 03.09.2022. DPR submitted to NMCG vide letter no. 1054/0736/SMCG 19-Jun-2024 05:40 PM
449 Gorakhpur Rohini Stepping Stone Nalla Untapped Drains 1.89 D.P.R. for “Gorakhpur Sewerage Scheme Zone-C, Part-2” amounting Rs. 566.15 Cr has been sanctioned under AMRUT 2.0. GO is awaited. 03-Jul-2024 04:55 PM
450 Gorakhpur Rohini Subhash Chandra Bose Collony Nalla Untapped Drains 4.49 Work is in progress under AMRUT. Proposed Date of completion is 31.03.2023 03-Jul-2024 04:54 PM
451 Lakhimpur Kheri Sarayan Sugar mill Drain Untapped Drains 0.90 DPR has been prepared by U.P. Jal Nigam (Urban) in SBM 2.0 and submmited for approval. 01-Jul-2024 12:00 AM
452 Saharanpur Kali West Suger mill Road Drain Untapped Drains 6.00 DPR submitted on 05.06.2023, IIT Roorkee TPA visit on 09.03.2024. TPAR submitted on 18.03.2024 01-Jul-2024 12:00 AM
453 Varanasi Ganga Sujabad Drain Untapped Drains 4.50 Project in tendering under AMRUT 2.0. Technical bids opened on 22.05.2024 01-Jul-2024 12:00 AM
454 Muzaffarnagar Kali West Sujru (Nala no.-6) Untapped Drains 1.71 I&D and STP works at Muzaffarnagar is ongoing under Namami Gange, likely to be completed by Jun-24. 01-Jul-2024 12:00 AM
455 Deoria Ghaghra Sulabh Sauchalay Nala(Azad Nagar South) Untapped Drains 0.04 NA 04-Jul-2024 04:10 PM
456 Saharanpur Harnandi (Hindon) Swami Dental clinic Untapped Drains 0.50 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
457 Saharanpur Harnandi (Hindon) Taj Nalla Untapped Drains 14.36 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
458 Ambedkar Nagar Tamsa tamsa pul ke pass Untapped Drains 1.50 Action to be taken 03-Jul-2024 01:13 PM
459 Sitapur Sarayan Tapdham Mandir Nala Untapped Drains 0.47 PFR for I&D of drains amount Rs. 306.81 Cr. has been send to NMCG for approval on dt. 07.04.2021. Observations by NMCG on dt. 12.06.2024 is raised. 01-Jul-2024 12:00 AM
460 Hathras Karvan Tarfara Drain Untapped Drains 5.85 Proposed to be tapped in 24 MLD STP under I&D and STP works at Hathras project. Tendering in progres 01-Jul-2024 12:00 AM
461 Gorakhpur Ghaghra Tarkulahi Nala Untapped Drains 0.08 Observation by NMCG dated 26/06/2024 was received regarding high COD/BOD. Regarding which COD/BOD test of 7drains is being done again, whose report will be submitted before 31/08/2024 28-Aug-2024 03:32 PM
462 Moradabad Ram ganga TDI City Drain Untapped Drains 4.86 To be tapped to 25 MLD STP. work is under progress. 01-Jul-2024 12:00 AM
463 Farrukhabad Ganga Tokaghat Untapped Drains 14.62 Tapping in progress & will be completed by 30.09.2024. Flow of this drain will diverted to 30 MLD STP at Farukhabad. 18-Sep-2024 11:21 AM
464 Agra Yamuna Transport Nagar Untapped Drains 1.71 Construction of 3.00 MLD capacity DSTP at Transport Nagar is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
465 Gorakhpur Rapti Transport Nagar Nalla Untapped Drains 0.92 DPR for I&D of 8 drains and STP works (44 MLD) has been submitted to NMCG vide SMCG letter no.1030/0 01-Jul-2024 12:00 AM
466 Ambedkar Nagar Tamsa udyan vibhag drain Untapped Drains 1.54 Action to be taken 03-Jul-2024 01:02 PM
467 Rae Bareli Sai UPSIDC Nala Untapped Drains 2.30 DPR will be prepared after acquisition of Land for I&D of 02 drains which is to be provided by NPP 18-Sep-2024 04:10 PM
468 Saharanpur Harnandi (Hindon) Valmiki Colony Untapped Drains 0.54 Price BER of I&D and STP (135 MLD) send to NMCG on dated 01.05.2024 01-Jul-2024 12:00 AM
469 Agra Yamuna Vayepur Untapped Drains 1.44 Construction of 2.35 MLD capacity DSTP at Vayepur village is in progress under Agra Sewerage Scheme 01-Jul-2024 12:00 AM
470 Ghaziabad Harnandi (Hindon) Vijay Nagar, B.S Road, Dasana Drain Untapped Drains 40.17 A PFR, amounting Rs. 440.68 cr. has been submitted under Smart City Programme for I&D and STP (60 and 77 MLD) 11-Jul-2024 10:50 AM
471 Lakhimpur Kheri Sarayan Vishnubeher Drain Untapped Drains 0.74 DPR has been prepared by U.P. Jal Nigam (Urban) in SBM 2.0 and submmited for approval. 01-Jul-2024 12:00 AM
472 Moradabad Ram ganga Vivekanand Hospital Drain (Left) Untapped Drains 1.08 To be tapped to 25 MLD STP. is under progress. 01-Jul-2024 12:00 AM
473 Moradabad Ram ganga Vivekanand Hospital Drain (Right) Untapped Drains 2.61 To be tapped to 25 MLD STP. work is under progress. 01-Jul-2024 12:00 AM
474 Ghazipur Ganga Ward No. 15 Malhiya Basti Drain Untapped Drains 1.00 City Sanitation action Plan has been submitted under SBM -2.0 by UPJN (Urban), SLTC awaited. 01-Jul-2024 12:00 AM
475 PrayagRaj Ganga Yadavpur drain Untapped Drains 0.65 Work is under progress by U.P.J.N (Urban) under Mahakumbh - 2025 01-Jul-2024 12:00 AM