Status of Sewage Treatment Plants (STPs) in Uttar Pradesh
December-2023

S.No STPs in UP Number Capacity (MLD) Utilization capacity (MLD) Utilization % Number of Compliant STP Number of Non compliant STP 
1 Total Installed STP (2+3+4) 133 3872.08 2890.41 74.6 85 36
2 Operational STP 130 3806.08 2890.41 75.9 85 29
i STP Achieving norms 105 - - - - -
ii STP Not Achieving norms 25 - - - - -
3 STP Not In Operation 3 66 - - - -
Grand Total A : 396 7,744.16 5,780.82 74.63 170 65
6 STP in Under Tendering 34
Note-:
The standards as per MOEF&CC Notification dated 13.10.2017, titled "Applicable Effluent Discharge Standards for STPs" are as follows:
For State Capital: pH-6.5-9.0; BOD - <20 mg/l; TSS- <50 mg/l & FC- <1000 MPN/100 ml
Other than State Capital:pH-6.5-9.0; BOD - <30 mg/l; TSS- <100 mg/l & FC- <1000 MPN/100 ml


Status UPJN(R) UPJN(U) Development Authority BLW UDD UPSIDC NOIDA/ G.NOIDA Awas Vikas NAPS Total
Compliant 34 40 13 0 3 1 12 1 1 105
Non-Compliant 3 12 7 1 2 0 0 0 0 25
Non-Operational 0 2 1 0 0 0 0 0 0 3
Total 37 54 21 1 5 1 12 1 1 133