STPs -Not In Operation December -2023 | |||||||||||||||
Sl. No. | Circles | Name and Address of STP | Year of Commissioning | District / City/ Town | Installed Capacity (MLD) | Utilized Capacity (MLD) | Rural\Urban\Other | Technology/process STP based |
Hotel/Ashram/ Authority/Local Urban body/other institutions responsible for O&M of STP |
Operation Status (functioning/non-operational (reason for non-operational)/ under construction/ constructed & commissioned |
Name of treated sewage receiving water body Drain/Sub-Tributary/ Tributary/River Ganga |
Name of river catchment in which STP is located (tributary of river Ganga/river Ganga) | Phase | Remark | |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | |
1 | Circle 2 | 4 MLD Kanwara Road | 1979 | Banda / Kanwara | 4 | 4 | U | Oxidation Pond | U.P. Jal Nigam | Not Operational | Ken river sub tributary Yamuna /Tributary Ganga River | Ken river sub tributary Yamuna /Tributary Ganga River | Phase-II | Permission from Railway Deptt. for laying the rising main pipeline beneath the railway line is awaited. Upon receipt of of permission, it will take 45 days to complete the pipe laying work and making the STP operational. NOC from Railway Deptt is likely to be given by 06.06.2021. | |
2 | Circle 7 | Moradabad | 2017 | Moradabad | 20 | 0 | O | SBR | MDA | Not Operational | Ramganga River | Ramganga River | Phase-I | Due to lack of sewage generation from the New MDA Colony near STP. | |
3 | 15 MLD Pehrigaon | 2015 | Rampur | 15 | 0 | U | UASB | U.P. Jal Nigam | Not Operational Since 18.01.2022 | Ramganga River | Ramganga River | Phase-I | Sewer line under maintenance | ||