Sr.No. District Town Name of Sewerage Project Scheeme Type Mode of Project AA&ES and date No. of STP STP Capacity No.Of Drains Agency Name Agreement Cost
Date of Start
Date of Comp. As per Agreement
Revised Date
Current progress
Date of updation
Remark
Date of Sanction Sanction cost (In Cr.) work Cost (In Cr.) Centage (In Cr.) O & M Cost (In Cr.) Physical Progress Financial Progress
Total -- 5883.27 2684.46 189.47 2997.22 38 1009.30 134 -- 4109.24 -- -- --
--
+ 11.18
1120.01
-- --
1 Agra Agra Agra Sewerage Scheme( Interception & diversion and STP works) NGP2-EAP HAM 06-May-2020 842.25 371.29 25.40 445.56 13 177.60 26 M/s AWWMPL Pvt Ltd 582.84 05-Apr-2023 04-Apr-2025 04-Apr-2025 +0.45
51.14
+0.00
150.22
18-Nov-2024
  • Component wise progress of Agra (HAM) 100 MLD STP- 62.50%, WIP 35 MLD STP- 70%, WIP 31 MLD STP- 68%, WIP MPS 03 Nos.- 10%, WIP Rising Main 9.55 Km- 38.64%, WIP Gravity Sewer 2.55 Km- 80%, WIP DSTP 10 Nos.- 5%, WIP Note- 1st Stage permission is granted for 07 Nos. DSTP Forest Land and 2nd stage permission is under process
2 Ayodhya Faizabad Pollution Abatement Works for River Saryu/Ghaghara at Faizabad town, District-Ayodhya (Interception & Diversion of Drains with 33 MLD STP) NGP HAM 06-May-2021 221.66 109.03 7.62 105.01 1 33.00 15 M/s Eco Protection Engineer Pvt Ltd 149.47 03-Mar-2023 02-Jan-2025 30-Sep-2024,
31-Dec-2024,
31-May-2024
+0.04
96.02
+0.00
76.75
20-Nov-2024
  • NMCG has given NOC for discharge of treated effluent in Saryu River dated 19.08.2024. Subsequently, correspondence with all supporting documents has been given to Irrigation Department for NOC of crossing effluent line across Bundha.
  • Precommissioning of MPS, PTU, SBR basin, Diffuser, Blower, Disc filter has been completed.
3 Farrukhabad Farrukhabad-Fatehgarh I&D and STP works at Farrukhabad-Fatehgarh NGP HAM 09-Feb-2021 261.12 188.71 6.98 72.41 2 47.70 8 M/S HNB Engineers Private Ltd. 252.41 28-Jun-2022 27-Jun-2024 27-Jun-2024,
30-Sep-2024,
31-Aug-2024,
31-Oct-2024
+0.10
95.60
+0.00
179.04
18-Nov-2024
  • Construction of STP has been completed. Electrical and Mechanical works of STP and associated I and D works are in progress. The power connection is to be provided by concerning department UPPCL. The power connection work under progress.
4 Hapur Hapur I&D and STP works at District-Hapur NGP DBOT 19-Sep-2023 49.06 22.85 1.42 24.79 1 6.00 1 M/s SKC Technocrat Pvt. Ltd (Formerly M/s Satish Kumar & Co.) & M/s. Geo Miller & Co. Pvt. Ltd. (JV) 39.28 08-Nov-2024 07-Nov-2026 +0.00
0.00
+0.00
0.00
  • Financial bid evaluation report sent to NMCG 0n 12.08.24
  • NOC received from NMCG New Delhi for Financial Bid on Dated 20-08-2024 vide letter no Pr-14011/04/2018-Tech Construction NMCG Dated 20.08.2024
  • LOI issued to M/s Satish Kumar vide SE Lt No. 196/790/10 Dt 24.08.24
  • Bank Guarantee not submitted by Firm.
  • Date of start is given on 08.11.24. Date of completion of work is 05.02.2026 to M/s SKC Technocrat Pvt. Ltd (Formerly M/s Satish Kumar & Co.) & M/s. Geo Miller & Co. Pvt. Ltd. (JV), Reg. Office B-29, IIIrd Floor, RDC Rajnagar, Ghaziabad - 201013. AGREEMENT cost of project is Rs. 39,28,13,617.00.
5 Hathras Hathras I&D and STP works at Hathras Town NGP DBOT 30-Jan-2023 128.91 70.48 4.55 53.88 1 24.00 10 M/s Neercare India pvt KLtd JV M/s EMIT Group India Pvt Ltd JV EMS Ltd 119.05 05-Jun-2026 06-Sep-2024 05-Jun-2026 +0.00
0.00
+0.00
0.00
15-Oct-2024
  • Date of start is 06.09.2024 and date of completion is 05.06.2024. Survey work is going on.
6 Kanpur Nagar Kanpur Nagar I&D and STP works at Kanpur-Pankha NGP HAM 12-Mar-2018 967.23 248.39 31.05 718.84 1 30.00 2 M/s Kanpur River Management Pvt. Ltd. 708.70 11-Oct-2019 25-Oct-2021 29-Feb-2024,
30-Sep-2024,
31-Aug-2024,
31-Oct-2024
+0.00
99.00
+0.00
298.00
18-Nov-2024
  • 30 MLD Panka STP has been commissioned. Works of Sludge handling Unit has been completed. OCEMS has been installed but not functional.
7 Lucknow Lucknow Pollution Abatement Of Gomti River (Phase 1 Part 1) Lucknow NGP DBOT 06-May-2020 213.91 101.31 6.97 105.63 2 42.50 2 M/s R.K. Engineers- Khilari Infrastructure (JV) 174.93 01-Jun-2022 30-Nov-2023 31-Jul-2024,
31-May-2024
+0.00
96.63
+0.00
94.86
18-Nov-2024
  • 39 MLD STP construction work completed and Trial & Run is in progress.
  • Date of start of 3.5 MLD Barikala STP is given on dt. 07.09.2024 to M/s R.K. Engineers Sales Ltd. - Khilari Infrastructures (JV). Presently STP site is submerged due to rain water. Presently Dewatering work is in progress.
8 Lucknow Lucknow Pollution Abatement of Gomti River (Phase-II, Part-I) Lucknow NGP DBOT 30-Jan-2023 264.67 137.55 8.53 118.60 1 50.00 3 M/s R.K. Engineers- Khilari Infrastructure (JV) 187.74 14-Jun-2024 13-Dec-2025 +0.00
0.00
+0.00
0.00
18-Nov-2024
  • Date of start is given on date 14.06.2024 to M/s R.K. Engineer sales ltd.-Khliari Infrastructures (JV). Construction of Staff Quarter is in progress. BEP for STP is submitted on dt. 12.11.2024, while site of SPS is submerged with rain water and dewatering work is in progress.
9 Mathura Chhata Chhata Town Sewerage Scheme (I&D and STP works), District Mathura NGP DBOT 25-Oct-2022 56.15 34.52 2.23 19.40 1 6.00 14 M/s Shailesh Kumar J.V. 48.97 12-Nov-2024 11-Aug-2026 +0.00
0.00
+0.00
0.00
  • Date of Start 12.11.2024 has been given to the firm. Survey and other related works is going on.
10 Mathura Vrindavan I&D and 13 MLD STP works at Vrindavan City NGP DBOT 25-Oct-2022 77.70 39.90 2.56 35.24 1 13.00 2 M/s SIMA -G D- N.P. (JV) 65.86 11-Jun-2024 10-Mar-2026 +0.70
5.00
+0.00
0.00
18-Nov-2024
  • LOA issued to firm on dated 15.03.2024. Effective Date of start for the work is 11.06.2024.Work is in progress.
11 Mathura Kosi Kalan I&D and STP works at Kosi Kalan Town, District Mathura NGP DBOT 25-Oct-2022 66.59 31.24 2.03 33.32 1 12.00 1 M/s R K Engineers Sales Ltd 53.60 16-Oct-2024 15-Jul-2026 +0.00
0.00
+0.00
0.00
  • LOA has been issued on date 18.06.2024 and Date of start has been given 16.10.2024 to the firm. Survey work is going on
12 Meerut Meerut I&D and STP works at Meerut NGP2-EAP HAM 06-May-2020 690.71 363.78 26.31 280.19 1 220.00 2 M/s. Meerut STP Pvt. Ltd. 369.74 11-Nov-2024 10-Nov-2026 +0.00
0.00
+0.00
0.00
  • Financial closure document and condition precedends is submitted to NMCG on dt 23.09.2024
  • Date of Start 11-11-2024 & Date of Completion 10-11-2026
  • Agreement is signed on 05.09.2023, Financial closure document is sent to NMCG on 15.05.2024 for review.
  • Due to non fulfillment of predefined condition precedends letter issued to concessanaire on dated 05.06.2024, 18.06.2024 and 30.07.2024.
  • LoA issued to JV M/s GA Infra ltd. Rajasthan and M/s SSG Infratech Pvt. Ltd, New Delhi on 27.05.2023.
13 Moradabad Moradabad Interception & Diversion (I&D) of Drains and Sewerage Treatment Plant at Moradabad zone 2 NGP HAM 23-Jul-2018 118.69 53.53 3.52 61.64 1 25.00 5 Moradabad STP Pvt Ltd 113.85 20-Jan-2023 19-Jan-2025 19-Jan-2025 +0.50
81.00
+0.00
54.19
18-Nov-2024
  • SBR progress is 85% and sewer has been laid 4669 m out of 6632
  • 03 milestones have been completed and 81% progress is achieved of project
14 Muzaffarnagar Muzzaffarnagar I&D and STP Work in Muzaffarnagar NGP HAM 13-Jan-2020 234.03 108.32 7.33 118.36 2 54.50 5 M/S Muzaffarnagar STP Pvt Ltd 205.09 04-Jun-2021 03-Jun-2023 30-Jun-2024,
30-Sep-2024
+0.00
95.68
+0.00
141.79
20-Nov-2024
  • 22 MLD STP Sahawali: Commissioned on 07.06.2023. Project completed on Oct, 2023
  • 32.5 MLD Kidwai Nagar: 02 Nos. I&D work completed, STP commissioned by Manual Mode by 02 I&D on dated 18 February, 2024. IPS 2A work in progress.
15 PrayagRaj Prayagraj Interception, Diversion of Balance 13 drains and Augmentation of Salori STP capacity by 43 MLD (Sewerage District-C) at Prayagraj Uttar Pradesh under DBOT mode NGP DBOT 14-Mar-2023 331.75 180.27 11.22 140.27 1 43.00 13 M/s HNB Private ltd. - M/s Tirupati Cements Products (JV) 204.40 19-Mar-2024 18-Aug-2025 +1.32
30.12
+0.00
22.74
20-Nov-2024
  • Basic Engineering Package has been vetted by IIT Delhi and same approved by UPJN (R)
  • GAD & RCC Design and Drawings of CCT, SBR Unit and Amitabh Bachhan Culvert SPS has been vetted by IIT Delhi and approved by UPJN (R)
  • Piling work is under progress for Primary Treatment Unit & Air Blower Room
  • RCC work for Raft and wall of SBR unit Basin 2, 3 & 4 of STP is under progress. PCC of Basin 1 has been completed and reinforcement work is under progress.
  • Casting of Outer Wall is completed .baffle wall work is under progress.
  • Casting of 3rd Lift of Wall at AB Culvert SPS has been completed. Sinking work up to 3rd Lift Completed. Reinforcement work is under progress
  • 2050 m laying of Rising main completed. Balance Laying is under progress
  • TEPS excavation & PCC work Completed and Reinforcement work is under progress.
16 PrayagRaj Prayagraj Interception, Diversion of Balance 7 drains and Augmentation of Rajapur STP capacity by 90 MLD (Sewerage District-D) at Prayagraj Uttar Pradesh under DBOT mode NGP DBOT 27-Jan-2023 475.98 242.85 15.24 217.89 1 90.00 7 M/s Triveni Engineering and Industries 309.74 24-Aug-2024 23-Feb-2026 +1.00
4.00
+0.00
7.12
20-Nov-2024
  • NMCG, New Delhi has given consent on dated 02.08.2024 regarding approval of financial bid.
  • Letter of Award (LOA) has been issued to the firm on dated 09.08.2024
  • Contract Agreement has been executed.
  • Date of Start 24.08.2024 and Date of Completion 23.02.2026 including 3 month of Trial and run has been given to the firm M/s Triveni Engineering and Industries Limited.
  • Survey, Design and Drawing work is in progress
  • Supply of 1000 DI K-9 Pipe for rising main is in progress.
  • Laying of rising main (1000 DI K-9 Pipe) is in progress
17 Shamli Banat I&D and STP Work in Banat, Shamli NGP DBOT 25-May-2023 48.71 24.93 1.58 22.20 1 5.00 3 M/s R K Engineers Sales Ltd 37.92 14-Oct-2024 13-Jan-2026 +0.00
0.00
+0.00
0.00
20-Nov-2024
  • LOA issue to M/s R.K. Engineers Sales Ltd. on Date 13-09-2024
  • Contract Agreement is signed on 08.10.2024 and Date of Start 14-10-2024 & Date of Completion 13-01-2026
18 Shamli Bantikhera Banat I&D and STP Work in Bantikhera and Babri village, Shamli NGP DBOT 25-May-2023 55.47 29.41 1.84 24.22 1 5.00 1 M/s R K Engineers Sales Ltd 41.91 14-Oct-2024 13-Jan-2026 +0.00
0.00
+0.00
0.00
20-Nov-2024
  • LOA issue to M/s R.K. Engineers Sales Ltd. on Date 13-09-2024
  • Contract Agreement is signed on 08.10.2024 and Date of Start 14-10-2024 & Date of Completion 13-01-2026
19 Shamli Shamli I&D and STP Work in Shamli NGP DBOT 25-May-2023 206.02 103.19 6.66 96.17 1 40.00 1 M/s R.K. Engineers Sales Ltd.-M/s Anand Constrwell Pvt. Ldt. (JV) 120.92 14-Oct-2024 13-Jan-2026 +0.00
0.00
+0.00
0.00
20-Nov-2024
  • LOA issue to M/s R.K. Engineers Sales Ltd.-M/s Anand Constrwell Pvt. Ldt. (JV) on Date 04-07-2024
  • Contract Agreement is signed on 08.10.2024 and Date of Start 14-10-2024 & Date of Completion 13-01-2026
20 Shamli Thanabhawan I&D and STP Work in Thanabhawan, Shamli NGP DBOT 25-May-2023 97.19 55.63 3.50 38.06 1 10.00 5 M/s R K Engineers Sales Ltd 63.72 14-Oct-2024 13-Jan-2026 +0.00
0.00
+0.00
0.00
20-Nov-2024
  • LOA issue to M/s R.K. Engineers Sales Ltd. on Date 31-08-2024
  • Contract Agreement is signed on 08.10.2024 and Date of Start 14-10-2024 & Date of Completion 13-01-2026
21 Unnao Shuklaganj I&D of Drains and STP works in Shuklaganj (05MLD) NGP HAM 28-Jul-2017 65.18 25.93 1.90 37.35 1 5.00 5 M/s KRMPL Kanpur 38.87 11-Oct-2019 10-Jul-2021 10-Jul-2021,
13-Jun-2023,
14-Dec-2022,
31-Aug-2024,
31-Jan-2025
+0.00
81.00
+0.00
23.47
18-Nov-2024
  • There are only 10-20 manpower has been engaged in centrifuge. Manhole PTU and I&D work No any manpower deployed in Electrical & Mechanical works from last 8-10 months. Progress of work is very poor.
22 Unnao Unnao I&D of Drains and STP works in Unnao (15MLD) NGP HAM 28-Jul-2017 102.20 43.73 3.22 55.25 1 15.00 1 M/s KRMPL Kanpur 68.68 11-Oct-2019 10-Jul-2021 10-Jul-2021,
15-Mar-2023,
15-Oct-2022,
15-Sep-2021,
25-Feb-2022,
30-Apr-2023,
30-Jun-2024,
31-Dec-2024,
31-Jul-2024
+0.00
95.50
+0.00
52.01
18-Nov-2024
  • Cleaning of 423mt. sewer line is balance till date and From last 2-3month KRMPL not deployed manpower at site for cleaning of Sewer line. STP 4-6 Hrs operating daily from 07.11.2023 through temporary line.
23 Varanasi Varanasi I&D and Treatment works for Assi-BHU Area (Phase-II), Varanasi NGP DBOT 19-Oct-2022 308.09 97.62 7.81 172.94 1 55.00 2 M/s Enviro Infra Engineers limited MTS JV 151.55 07-Mar-2024 06-Dec-2025 +1.00
21.00
+11.18
19.82
20-Nov-2024
  • BEP submitted by firm to which observation have been raised. compliance pending.
  • Soil testing done. Team mobilized at site.
  • Meeting held under chairmanship of APD Sir on 20.06.2024 to resolve issues of design/drawing. Firm submitted BEP of STP only on 24.06.2024
  • Vetting of process flow of STP and MPS done by IIT-BHU. Structural drawing awaited. Preparatory works in progress