Phase 1

Physical Progress All Scheme

Total Scheme : 63 O&M Scheme : 45 Under Trial Run Scheme : 4 In-Progress Scheme : 14
S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trial Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply Regular Water Supply Villages(Village Wise) CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Commissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismantle(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Last Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Current Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Regular water supply Villages Below 50% 50% to 75% 76% to 90% Above 90% 100% Household with RWS Required Started Completed Completed
CWR Images Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Commissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 35 OHT
  • 2 CWR
  • 133.79 D.System
  • 72 Comissioning
  • 2 Electricity
  • 12496 FHTC
  • 729 HGJ
  • 1773 HGJ CERT
  • 6157 HOV
  • Scheme Wise Category A
  • 812 No. of Schemes
  • 1431 No. of Villages
  • Scheme Wise Category B
  • 3886 No. of Schemes
  • 7130 No. of Villages
  • Scheme Wise Category C
  • 1031 No. of Schemes
  • 1522 No. of Villages
  • Scheme Wise Total
  • 5729 Total No. of Schemes
  • 10083 Total No. of Villages
  • Village Wise Category A
  • 1158 No. of Villages
  • Village Wise Category B
  • 5725 No. of Villages
  • Village Wise Category C
  • 2996 No. of Villages
  • Village Wise Total
  • 9879 Total No. of Villages
  • 4690 Agreement Done Scheme
  • 8383 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Total Schemes : 63 6547 49 53 45 45 45 4095 3898 6190013 74280156 10762 10439 97%
+0
5838
89 98.99 61 166 / 16 100.00 62 359 / 17
+0
557 / 557
213 / 83 1699
+0
1689
842 5 0 3 17
  +0
1644 | 1664
1583 0 / 0 1307 / 104 1136 -- -- -- 49 48 236 929 44 44 226 851 -- 7813 1500 1699 510 266 851 923 232 245 -- -- 0 + 3 + 0 + 33 + 0 = 36 0 + 5 + 0 + 62 + 0 = 67 449 213 330851 2315957 9925530 113092566 34182.33% 2472707609 2485893096 5941 462 171 221 653 4434 455
+0
453
+0
453
453 0 58117.33
+0.00
57983.54
6547 1685084 5817
+ 0
4773
1672592 0 0 99.26
+0
900 / 898
+0
6398 / 5256
1624724.00
+0.00 / +0.00
1448305.80
89.14% 8 8 5 23676 23017 659 1902 1348 554
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 1 1 1 342 342 0 0 691 690 100%
+0
338
99 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 22 114 Verified Verified 18 95 Verification Remarks Minutes of Meeting 735 650 116 0 7 95 109 34 1 21 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 37 26 39788 278516 1193640 29363 73.80% 173584 548036 342 0 0 11 38 293 39
+0
39
+0
39
39 0 4215.00
+0.00
4215.00
342 127889 342
+ 0
324
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +0.00
142656.23
91.26% 1706 1653 53 112 102 10
  • 18 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 97 No. of OHT in O&M Schemes
  • 29813 Water Demand(M3)
  • 31207.66 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 580 100%
+0
202
100 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Off Verified Verified 12 70 Verified Verified 12 65 Verification Remarks Minutes of Meeting 233 149 80 0 1 65 79 5 30 29 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 24 4 27609 193263 828270 49079 177.76% 275162 3056245 202 0 0 0 12 190 13
+0
13
+0
13
13 0 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
88170.52
94.58% 2632 2598 34 85 85 0
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 2 2 2 544 544 0 0 1271 1269 100%
+0
540
99.26 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 34 184 2 2 30 184 -- 968 799 196 0 8 160 188 39 31 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 61 30 67397 471779 2021910 78442 116.39% 448746 3604281 544 0 0 11 50 483 52
+0
52
+0
52
52 0 6796.60
+0.00
6796.60
544 210155 544
+ 0
525
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +0.00
230826.75
92.50% 0 0 0 4338 4251 87 197 187 10
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 95 88 93%
+0
64
93 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 0 0 0
  +0
28 | 28
26 0 / 0 4 / 0 3 Integrated Verified Verified 0 26 Verified Verified 0 25 Verification Remarks Minutes of Meeting 334 0 28 5 7 25 16 3 10 14 9 0 + 3 + 0 + 0 + 0 = 3 0 + 5 + 0 + 0 + 0 = 5 6 5 4466 31262 133980 7286 163.14% 36407 127650 66 6 2 5 13 40 11
+0
11
+0
11
11 0 882.90
+0.00
878.65
69 19570 69
+ 0
53
19570 0 0 100.00
+0
13 / 13
+0
66 / 65
30332.00
+0.00 / +0.00
23608.05
77.83% 209 202 7 31 2 29
  • 4 D.System
  • 3 COV
  • 16 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
May-26
CWR
June-24
D.System
30-Dec-2026
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 31-May-2026 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2026 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 122 HGJ Certified
  • 87.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 43 No. of Schemes
  • 102 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 47 No. of Villages
  • Village Wise Category B
  • 0 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 47 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 81 Total No. of OHT
  • 19 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5482 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 0 Agreement Done Scheme
  • 0 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 83 83 100%
+0
59
100 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 108 0 17 5 1 17 11 4 1 3 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 3 2722 19054 81660 2417 88.80% 16537 27452 59 0 0 1 12 46 6
+0
6
+0
6
6 0 576.00
+0.00
567.05
59 11925 59
+ 0
59
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20939.14
98.03% 169 164 5 22 1 21
  • 8 D.System
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 371 343 92%
+0
242
85 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 0
  +0
91 | 91
87 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 28 Verified Not Verified 5 23 Verification Remarks Minutes of Meeting 576 0 91 7 84 23 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 34 24 0 0 0 0 0% 0 0 225 75 5 0 72 73 20
+0
20
+0
20
20 0 3052.00
+0.00
2846.86
286 86157 284
+ 0
131
86114 0 0 99.95
+0
21 / 21
+0
250 / 180
95975.00
+0.00 / +0.00
77188.06
80.43% 811 767 44 118 2 116
  • 205 D.System
  • 34 COV
  • 43 FHTC
  • 2 HGJ
  • 155 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 454 426 94% 301 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 0
  +0
108 | 108
104 0 / 0 51 / 0 15 -- -- -- 2 1 10 45 2 1 8 40 -- 684 0 108 12 85 40 11 4 1 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 39 27 2722 19054 81660 2417 88.80% 16537 27452 284 75 5 1 84 119 26
+0
26
+0
26
26 0 3628.00
+0.00
3413.91
345 98082 343
+ 0
190
98039 0 0 100
+0
28 / 28
+0
309 / 239
117334.00
+0.00
98127.20
84% 980 931 49 140 3 137
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 549 514 94%
+0
365
88.16 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 0 0 0
  +0
136 | 136
130 0 / 0 55 / 0 18 -- -- -- 3 2 10 71 3 2 8 71 -- 1018 0 136 17 92 65 27 7 11 -- -- 0 + 3 + 0 + 0 + 0 = 3 0 + 5 + 0 + 0 + 0 = 5 45 32 7188 50316 215640 9703 134.99% 52944 155102 350 81 7 6 97 159 37
+0
37
+0
37
37 0 4510.90
+0.00
4292.56
414 117652 412
+ 0
243
117609 0 0 99.96
+0
41 / 41
+0
375 / 304
147666.00
+0.00 / +0.00
121735.25
82.44% 0 0 0 1189 1133 56 171 5 166
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 3092513 37110156 793 793 100%
+0
193
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
130 / 130
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Verified Verified 0 3 Verified Verified 0 3 Verification Remarks Minutes of Meeting 73 0 130 118 2 3 10 4 5 16 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 7 1590 11130 47700 3244 204.03% 1891656328 1891677907 193 0 0 0 11 182 6
+0
6
+0
6
6 0 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes Yes 1423 1404 19 88 85 3
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 25565.51 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 129 20-Mar-2024 1 1 1 1 129 128 3097500 37170000 412 412 100%
+0
129
100 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Verified 6 43 Verified Verified 6 32 Verification Remarks Minutes of Meeting 315 0 46 0 13 32 33 13 12 4 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 1 9905 69335 297150 24889 251.28% 125012 232729 129 0 0 0 12 117 10
+0
10
+0
10
10 0 1214.00
+0.00
1213.70
129 45475 129
+ 0
128
45475 0 0 100.00
+0
10 / 10
+0
129 / 129
39878.00
+0.00 / +0.00
37750.20
94.66% Yes Yes 1177 1167 10 58 54 4
  • 1 HGJ CERT
  • 127 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 6190013 74280156 1204 1204 100%
+0
322
100 100.00 2 11 / 0 100.00 2 5 / 0
+0
130 / 130
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 6 46 2 2 6 46 -- 388 0 176 118 15 35 43 17 17 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 8 11495 80465 344850 28133 244.74% 1891781340 1891910636 322 0 0 0 23 299 16
+0
16
+0
16
16 0 2541.83
+0.00
2541.53
322 105150 322
+ 0
319
105150 0 0 100
+0
83 / 83
+0
322 / 322
66979.00
+0.00 / +0.00
63469.72
94.76% 2 2 0 2600 2571 29 146 139 7
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 1123 968 86%
+0
231
45 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
272 0 0 3 16
  +0
234 | 253
189 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 55 28 0 0 0 0 0% 0 0 278 145 60 24 23 26 5
+0
5
+0
5
5 0 2511.00
+0.00
2507.80
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +0.00
51396.42
98.53% 892 802 90 103 59 44
  • 19 OHT
  • 3 D.System
  • 5 COV
  • 2 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 55 HGJ Certified
  • 90.16 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 11082.79 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 168 133 79%
+0
42
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 3 0 0 0 0 0% 0 0 38 28 3 0 7 0 7
+0
7
+0
7
7 0 495.00
+0.00
494.49
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 37
20745.00
+0.00 / +0.00
7276.12
35.07% 99 92 7 16 3 13
  • 3 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 162 132 81%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 6 0 0 0 0 0% 0 0 27 17 4 0 5 1 6
+0
6
+0
6
6 0 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +0.00
4250.57
32.31% 167 153 14 22 21 1
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1453 1233 85% 307 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
301 0 0 3 17
  +0
261 | 281
215 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 70 37 0 0 0 0 0% 0 0 343 190 67 24 35 27 18
+0
18
+0
18
18 0 3431.00
+0.00
3426.54
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 171
86063.00
+0.00
62923.11
73% 1158 1047 111 141 83 58
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 1 197 158 0 0 496 496 100%
+0
186
94 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 10 56 Verified Verified 10 56 Verification Remarks Minutes of Meeting 257 0 56 0 18 56 38 23 11 20 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 2 10393 72751 311790 172221 1657.09% 7946003 8586533 197 0 0 13 34 150 11
+0
11
+0
11
11 0 1715.00
+0.00
1715.00
197 43098 197
+ 0
181
43098 0 0 100.00
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
44913.13
88.76% 488 479 9 42 42 0
  • 16 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 1 4 1 1 1 197 158 0 0 1949 1727 89%
+0
493
57.53 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
357 0 0 3 17
  +0
317 | 337
271 0 / 0 169 / 0 24 -- -- -- 1 1 10 56 1 1 10 56 -- 257 0 357 301 18 56 38 23 11 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 78 39 10393 72751 311790 172221 1657.09% 7946003 8586533 539 189 67 37 69 177 29
+0
29
+0
29
29 0 5146.00
+0.00
5141.54
857 184499 413
+ 0
275
180667 0 0 97.92
+0
156 / 154
+0
842 / 368
136662.00
+0.00 / +0.00
107836.24
78.91% 0 0 0 1635 1515 120 181 123 58
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 242 218 90%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 43 0 13 12 1 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 14 0 0 0 0 0% 0 0 80 6 0 0 11 63 8
+0
8
+0
8
8 0 899.95
+0.00
899.00
87 32259 82
+ 0
29
32223 0 0 99.89
+0
9 / 9
+0
87 / 66
29730.00
+0.00 / +0.00
26146.92
87.95% 388 353 35 33 24 9
  • 36 FHTC
  • 5 HGJ
  • 58 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 52 No. of Villages
  • Village Wise Category C
  • 18 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 141 87%
+0
28
30 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 8 0 0 0 0 0% 0 0 81 15 3 5 25 33 9
+0
9
+0
9
9 0 786.55
+0.00
786.00
93 27437 33
+ 0
8
27285 0 0 99.45
+0
10 / 10
+0
91 / 59
29676.00
+0.00 / +0.00
18958.13
63.88% 301 270 31 34 16 18
  • 2 COV
  • 152 FHTC
  • 60 HGJ
  • 85 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 179 165 92%
+0
42
40 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11 9 0 0 0 0 0% 0 0 80 19 10 6 11 34 11
+0
11
+0
11
11 0 868.26
+0.00
863.85
106 27423 39
+ 0
1
27209 0 0 99.22
+0
12 / 12
+0
98 / 45
29490.00
+0.00 / +0.00
25567.66
86.70% 149 133 16 41 26 15
  • 4 D.System
  • 8 COV
  • 214 FHTC
  • 67 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 583 524 90% 83 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 12 / 0 23 -- -- -- -- 43 0 40 39 1 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 50 31 0 0 0 0 0% 0 0 241 40 13 11 47 130 28
+0
28
+0
28
28 0 2554.76
+0.00
2548.85
286 87119 154
+ 0
38
86717 0 0 100
+0
31 / 31
+0
276 / 170
88896.00
+0.00
70672.71
80% 838 756 82 108 66 42
Indian Hume Pipe


8010037 Kuraicha GOV 74 05-Feb-2024 1 1 1 1 74 72 0 0 294 294 100%
+0
72
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 137 0 14 0 0 14 14 1 3 30 14 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 4 3 8491 59437 254730 8508 100.20% 2738827 2980867 71 0 0 0 1 70 11
+0
11
+0
11
11 0 859.73
+0.00
859.37
74 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 393 388 5 25 23 2
  • 9 FHTC
  • 1 HGJ
  • 4 HGJ CERT
  • 74 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 68 68 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 46 1 5 0 0 5 5 1 3 30 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 1930 13510 57900 110732667 5737443.89% 553608751 553680704 25 0 0 0 6 19 4
+0
4
+0
4
4 0 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6711.81
89.29% Yes 126 125 1 5 5 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 85 85 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 63 0 7 0 3 7 4 3 1 27 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 2 2295 16065 68850 5909 257.47% 67573 187696 37 1 0 1 7 28 4
+0
4
+0
4
4 0 297.97
+0.00
297.97
37 11549 37
+ 0
37
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11923.47
94.31% Yes 173 160 13 6 5 1
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 100 100 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 25 0 7 0 0 7 7 2 1 30 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3346 23422 100380 3263 97.52% 24606 131943 42 0 0 2 3 37 4
+0
4
+0
4
4 0 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 78 78 0 19 18 1
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 189 100%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 70 0 14 0 0 14 14 3 8 27 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 2 8009 56063 240270 9800 122.36% 78675 336488 59 2 1 6 22 28 8
+0
8
+0
8
8 0 869.06
+0.00
869.06
59 26650 59
+ 0
55
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26962.89
96.32% Yes 332 327 5 16 15 1
  • 4 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 442 442 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 204 1 33 0 3 33 30 9 13 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 5 15580 109060 467400 110751639 710857.76% 553779605 554336831 163 3 1 9 38 112 20
+0
20
+0
20
20 0 1724.58
+0.00
1724.58
163 56361 163
+ 0
158
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56463.15
95% 709 690 19 46 43 3
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 76 76 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 33 24 6 0 0 6 6 1 1 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 4025 28175 120750 2869 71.28% 40690 173950 32 0 0 0 0 32 3
+0
3
+0
3
3 0 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
9021.80
92.97% Yes 252 248 4 5 5 0
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 263 263 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 93 77 9 0 1 9 8 0 6 25 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 3641 25487 109230 5913 162.40% 46216 216033 57 0 0 0 0 57 5
+0
5
+0
5
5 0 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
13881.43
94.79% Yes 203 201 2 14 12 2
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1656 1595 96%
+0
404
66.01 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 510 102 102 39 5 62 58 11 23 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 70 39 31738 222166 952140 110768929 349010.43% 556605338 557707682 564 43 14 20 86 401 67
+0
67
+0
67
67 0 5890.10
+0.00
5883.83
612 201505 479
+ 0
355
201094 0 0 99.80
+0
117 / 117
+0
600 / 491
200615.00
+0.00 / +0.00
177993.17
88.72% 0 0 3 2395 2283 112 198 149 49
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 7 13 Verified Verified 7 12 Verification Remarks Minutes of Meeting 103 0 13 0 1 12 12 2 5 28 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 3955 27685 118650 7854 198.58% 36543 163388 50 0 0 0 3 47 9
+0
9
+0
9
9 0 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17578.70
99.83% Yes 145 144 1 25 25 0
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 15 No. of Schemes
  • 20 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 5 No. of Schemes
  • 5 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 20 Schemes Sent to O&M
  • 36 No. of OHT in O&M Schemes
  • 11198 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 5 17 Verified Verified 5 14 Verification Remarks Minutes of Meeting 118 0 17 0 3 14 14 2 2 24 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 5247 36729 157410 11454 218.30% 72973 312167 60 0 0 1 4 55 8
+0
8
+0
8
8 0 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
23998.94
97.56% 379 378 1 24 24 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Verified Verified 2 13 Verified Verified 2 13 Verification Remarks Minutes of Meeting 99 0 15 0 1 13 14 0 12 27 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 5537 38759 166110 12199 220.32% 207235 464297 59 0 0 1 3 55 5
+0
5
+0
5
5 0 462.02
+0.00
520.82
60 17590 60
+ 0
54
17590 0 0 100.00
+0
6 / 6
+0
60 / 59
23368.00
+0.00 / +0.00
22206.49
95.03% 252 250 2 26 26 0
  • 6 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 55 100%
+0
58
100 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 10 Verified Verified 2 9 Verification Remarks Minutes of Meeting 102 0 11 0 2 9 9 0 5 24 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 2482 17374 74460 5469 220.35% 46692 155663 58 0 0 0 3 55 5
+0
5
+0
5
5 0 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 58
15059.00
+0.00 / +0.00
14955.24
99.31% 124 124 0 12 12 0
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 62 100%
+0
7
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 52 0 4 0 0 10 4 0 2 27 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1696 11872 50880 3460 204.01% 32227 109725 7 0 0 0 1 6 2
+0
2
+0
2
2 0 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5976.98
100.00% 85 84 1 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 1 28 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 923 6461 27690 0 0% 0 0 15 0 0 0 0 15 3
+0
3
+0
3
3 0 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +0.00
4881.97
81.42% 55 55 0 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 557 100% 251 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 21 63 5 5 21 58 -- 474 0 66 0 7 58 59 4 27 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 0 19840 138880 595200 40436 203.81% 395670 1205240 249 0 0 2 14 233 32
+0
32
+0
32
32 0 2005.26
+0.00
2219.47
251 73409 251
+ 0
238
73409 0 0 100
+0
37 / 37
+0
251 / 249
92606.00
+0.00
89598.32
97% 1040 1035 5 96 96 0
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 15 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 1 1 Verified Verified 0 0 Verification Remarks Minutes of Meeting 103 68 6 0 6 0 0 0 0 16 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 0 0 0 0 0% 0 9102 15 0 0 1 1 13 3
+0
3
+0
3
3 0 108.90
+0.00
108.90
15 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
15 / 15
4615.00
+0.00 / +0.00
3841.40
83.24% 62 59 3 5 4 1
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 29 21 4 0 0 4 4 0 2 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 1704 152.55% 1606520 2446386 16 0 0 0 0 16 3
+0
3
+0
3
3 0 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
4075.86
88.34% Yes 33 33 0 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 1 1 1 1 23 20 0 0 54 54 100%
+0
22
96 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 30 19 8 0 0 8 8 1 3 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 2 2551 17857 76530 3240 127.01% 24682 87143 23 0 1 0 2 20 4
+0
4
+0
4
4 0 148.83
+0.00
148.78
23 8735 23
+ 0
19
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +0.00
8027.09
91.28% 155 149 6 12 12 0
  • 4 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 38 27 8 0 0 8 8 1 2 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1989 13923 59670 2145 107.84% 20421 85135 31 0 0 0 3 28 4
+0
4
+0
4
4 0 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
8610.34
97.45% Yes 51 49 2 9 9 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 108 72 12 0 12 12 0 0 0 23 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 0 0 0 0 0% 0 39420 32 0 0 0 4 28 3
+0
3
+0
3
3 0 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 32
9528.00
+0.00 / +0.00
9028.53
94.76% 197 191 6 18 18 0
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 24 17 4 0 0 4 4 0 1 26 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1875 13125 56250 2121 113.12% 20499 83524 17 0 0 0 0 17 2
+0
2
+0
2
2 0 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
5052.79
84.12% 76 76 0 6 6 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 5 5 5 5 119 113 0 0 215 215 100% 118 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 229 156 36 0 12 36 24 2 8 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 3 7532 52724 225960 9210 122.28% 1672122 2741608 119 0 1 0 9 109 16
+0
16
+0
16
16 0 682.92
+0.00
682.70
119 35931 119
+ 0
114
35931 0 0 100
+0
21 / 21
+0
119 / 119
37779.00
+0.00
34794.61
92% 512 498 14 52 52 0
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 52 0 7 0 0 7 7 0 4 24 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 0 4365 30555 130950 132845 3043.41% 554602 672668 47 0 1 0 8 38 5
+0
5
+0
5
5 0 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 45
14171.00
+0.00 / +0.00
13523.42
95.43% 243 239 4 17 17 0
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 216 0 10 0 0 9 10 1 1 16 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 4224 29568 126720 4321 102.30% 30148 75004 54 3 3 0 15 33 6
+0
6
+0
6
6 0 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 50
13299.00
+0.00 / +0.00
11725.18
88.17% 342 340 2 23 21 2
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 101 0 15 0 0 15 15 5 6 27 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 1 4790 33530 143700 5899 123.15% 84804 164072 45 1 0 0 1 43 7
+0
7
+0
7
7 0 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
15925.10
95.47% 209 204 5 20 19 1
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 15 31 3 3 14 31 -- 369 0 32 0 0 31 32 6 11 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 1 13379 93653 401370 143065 1069.33% 669554 911744 146 4 4 0 24 114 18
+0
18
+0
18
18 0 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 139
44151.00
+0.00
41173.70
93% 794 783 11 60 57 3
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 67 0 8 0 0 8 8 0 0 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1277 8939 38310 1329 104.07% 9285 41097 19 0 0 0 0 19 2
+0
2
+0
2
2 0 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 40 40 0 6 6 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 16 16 16 16 550 540 0 0 1143 1143 100%
+0
549
99.82 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 55 139 15 15 53 139 -- 1242 224 148 0 25 133 123 12 46 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 26 4 42033 294231 1260990 194039 461.63% 2746631 4908793 547 4 4 3 48 488 71
+0
71
+0
71
71 0 4206.32
+0.00
4420.29
550 156973 549
+ 0
531
156973 0 0 100
+0
86 / 86
+0
549 / 541
183187.00
+0.00 / +0.00
172842.42
94.35% 0 2 0 2441 2408 33 214 210 4
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 60 01-Dec-2023 1 1 1 1 60 60 0 0 254 254 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 98 47 18 0 1 18 17 6 6 26 11 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 4 6407 44849 192210 4566 71.27% 38302 152209 59 0 0 0 5 54 6
+0
6
+0
6
6 0 672.57
+0.00
672.20
60 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
60 / 60
27118.00
+0.00 / +0.00
27118.00
100.00% Yes Yes Yes 526 502 24 11 3 8
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 74 Villages
  • 26604 Households
  • 0 Last Week FHTC Given
  • 26428 FHTC Given
  • 99 FHTC(%)
  • 176 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 85.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 66.22 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 31 Schemes Sent to O&M
  • 33 No. of OHT in O&M Schemes
  • 6471 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 75 15-Mar-2024 1 1 1 1 75 74 0 0 243 243 100%
+0
75
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 9 31 Verified Verified 9 30 Verification Remarks Minutes of Meeting 212 0 32 0 6 30 26 5 9 22 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 4847 33929 145410 7726 159.40% 2315589 2460426 75 1 1 1 6 66 10
+0
10
+0
10
10 0 601.08
+0.00
599.17
75 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
75 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 612 612 0 22 6 16
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 282 282 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 298 0 40 0 0 40 40 12 16 25 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 6961 48727 208830 20405 293.13% 153629 335197 77 1 0 6 8 62 22
+0
22
+0
22
22 0 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +0.00
26008.94
100.00% Yes Yes Yes 495 493 2 20 12 8
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 152 2 2 2 2 152 151 0 0 525 525 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 31 71 2 2 31 70 -- 510 0 72 0 6 70 66 17 25 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 11808 82656 354240 28131 238.24% 2469218 2795623 152 2 1 7 14 128 32
+0
32
+0
32
32 0 1386.08
+0.00
1383.42
152 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
152 / 150
49611.00
+0.00
48943.08
99% 1107 1105 2 42 18 24
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 36 01-Jul-2024 1 1 1 1 36 35 0 0 181 181 100%
+0
35
97 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 12 Verified Verified 0 2 Verification Remarks Minutes of Meeting 136 0 13 0 5 2 8 7 1 19 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 2288 16016 68640 466 20.37% 2620 14971 36 0 0 6 12 18 9
+0
9
+0
9
9 0 349.51
+0.00
349.35
36 11799 36
+ 0
35
11799 0 0 100.00
+0
9 / 9
+0
36 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes Yes Yes 204 196 8 0 0 0
  • 1 HGJ CERT
  • 36 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 418 418 100%
+0
95
100 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 1 24 Verified Verified 1 11 Verification Remarks Minutes of Meeting 178 0 29 0 3 11 26 3 2 24 11 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 4 + 0 = 4 14 9 7972 55804 239160 18371 230.44% 122604 315487 90 0 4 7 41 38 9
+0
9
+0
9
9 0 804.48
+0.00
801.00
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +0.00
28849.34
86.63% Yes 650 624 26 4 0 4
  • 3 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 343 5 5 4 4 4 248 246 0 0 1375 1375 100%
+0
342
99.71 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 38 125 5 5 38 125 -- 922 47 132 0 15 101 117 33 34 -- -- 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 5 + 0 = 5 36 20 28475 199325 854250 51534 180.98% 2632744 3278290 337 2 5 20 72 238 56
+0
56
+0
56
56 0 3212.64
+0.00
3205.97
343 112046 343
+ 0
328
112046 0 0 100
+0
59 / 59
+0
343 / 338
125817.00
+0.00 / +0.00
118457.11
94.15% 4 3 2 2487 2427 60 57 21 36
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Verified Verified 1 2 Not Verified Not Verified 1 0 Verification Remarks Minutes of Meeting 132 0 12 0 5 0 7 4 2 15 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 5 5239 36673 157170 9624 183.70% 55934 156467 123 0 3 2 19 99 5
+0
5
+0
5
5 0 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
25970.57
96.54% 236 230 6 17 1 16
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 58 No. of Schemes
  • 113 No. of Villages
  • Scheme Wise Category C
  • 13 No. of Schemes
  • 18 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 55 Schemes Sent to O&M
  • 57 No. of OHT in O&M Schemes
  • 11888 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 58 Agreement Done Scheme
  • 114 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 5 7 Verified Verified 5 7 Verification Remarks Minutes of Meeting 180 0 15 0 4 7 11 5 4 27 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 3791 26537 113730 10397 274.25% 16181 139158 86 0 1 6 5 74 6
+0
6
+0
6
6 0 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 245 240 5 20 9 11
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 141 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
100 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 138 0 12 0 1 9 11 10 0 29 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 3 8624 60368 258720 4521 52.42% 4521 130655 138 3 2 4 9 120 7
+0
7
+0
7
7 0 723.50
+0.00
723.50
141 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
141 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 352 341 11 38 1 37
  • 118 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 213 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
100 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 10 Verified Verified 6 10 Verification Remarks Minutes of Meeting 268 0 25 0 1 10 24 14 5 27 3 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 8 3 14241 99687 427230 538315 3780.04% 1072622 1325826 207 1 3 2 2 199 11
+0
11
+0
11
11 0 1327.06
+0.00
1327.06
213 42736 212
+ 0
207
42734 0 0 100.00
+0
13 / 13
+0
213 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 500 475 25 54 6 48
  • 2 FHTC
  • 1 HGJ
  • 6 HGJ CERT
  • 173 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 440 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 16 26 3 3 15 26 -- 586 0 52 0 6 26 46 29 9 -- -- 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 16 7 26656 186592 799680 553233 2075.45% 1093324 1595639 431 4 6 12 16 393 24
+0
24
+0
24
24 0 3022.67
+0.00
3022.67
440 92848 439
+ 0
434
92846 0 0 100
+0
29 / 29
+0
440 / 437
81119.00
+0.00
77310.33
95% 1097 1056 41 112 16 96
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+5
30
0 0 0 0 0
  +0
30 | 30
25 0 / 0 25 / 0 25 Integrated Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 46 33 30 0 1 29 29 0 6 28 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 0 11180 78260 335400 13353 119.44% 88427 387112 159 0 0 4 17 138 9
+0
9
+0
9
9 0 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29948.30
91.23% Yes Yes 375 366 9 26 26 0
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 27 18 25 0 0 23 25 0 15 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 0 11579 81053 347370 748892 6467.67% 7755916 10092331 254 0 0 3 20 231 7
+0
7
+0
7
7 0 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 254
33415.00
+0.00 / +0.00
31276.44
93.60% Yes Yes 451 442 9 43 43 0
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+5
55
0 0 0 0 0
  +0
55 | 55
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 73 51 55 0 1 52 54 0 21 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 0 22759 159313 682770 762245 3349.20% 7844343 10479443 413 0 0 7 37 369 16
+0
16
+0
16
16 0 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 413
66243.00
+0.00
61224.74
92% 826 808 18 69 69 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Verified 1 89 Verified Verified 1 89 Verification Remarks Minutes of Meeting 174 107 102 0 3 89 99 19 10 24 13 0 + 0 + 0 + 14 + 0 = 14 0 + 0 + 0 + 24 + 0 = 24 9 1 24510 171570 735300 24782 101.11% 181455 668649 305 5 6 15 27 252 2
+0
2
+0
2
2 0 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 1313 1303 10 107 105 2
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
62
98 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Verified Verified 1 3 Verified Not Verified 1 2 Verification Remarks Minutes of Meeting 39 0 5 0 0 2 5 4 1 21 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 2968 20776 89040 4001 134.80% 28799 90180 63 0 1 4 12 46 1
+0
1
+0
1
1 0 248.50
+0.00
248.50
63 9280 62
+ 0
60
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
6413.97
98.71% 90 90 0 11 3 8
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 263 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
258
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Off Verified Verified 0 35 Verified Verified 0 34 Verification Remarks Minutes of Meeting 83 0 48 0 0 34 48 13 6 18 13 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 6 1 16245 113715 487350 13687 84.25% 98177 378927 262 1 1 0 34 226 2
+0
2
+0
2
2 0 1344.50
+0.00
1344.50
263 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12393.12
95.46% 628 622 6 61 59 2
  • 2 COV
  • 136 FHTC
  • 4 HGJ
  • 13 HGJ CERT
  • 242 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1069 100%
+0
1595
99.19 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
274
0 0 0 0 0
  +0
274 | 274
269 0 / 0 291 / 99 296 -- -- -- 9 9 34 208 8 7 33 208 -- 1087 158 274 0 15 203 259 69 49 -- -- 0 + 0 + 0 + 17 + 0 = 17 0 + 0 + 0 + 28 + 0 = 28 50 14 98380 688660 2951400 1367571 1390.09% 9302032 13369304 1597 10 17 40 145 1385 50
+0
50
+0
50
50 0 10277.99
+0.00
10351.79
1608 311056 1600
+ 0
1573
310295 0 0 99.76
+0
200 / 200
+0
1599 / 1568
200307.00
+0.00 / +0.00
189875.73
94.79% 2 0 0 4190 4109 81 375 253 122
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 1 1 1 1 179 97 0 0 20 20 100%
+0
170
95 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Not Verified Verified 12 22 Not Verified Verified 12 22 Verification Remarks Minutes of Meeting 226 0 27 3 11 22 13 1 3 12 6 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 20 + 0 = 20 9 5 9808 68656 294240 24534 250.14% 110020 253454 151 5 1 2 4 139 16
+0
16
+0
16
16 0 3904.00
+0.00
3904.00
179 66179 178
+ 0
136
66172 0 0 99.99
+0
14 / 14
+0
171 / 73
74794.00
+0.00 / +0.00
65085.22
87.02% 509 496 13 68 68 0
  • 7 FHTC
  • 1 HGJ
  • 43 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Jul-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17571 FHTC Given
  • 96 FHTC(%)
  • 598 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 38 No. of Villages
  • Village Wise Category C
  • 44 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 190 130 15 0 0 0 15 7 3 30 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 6425 44975 192750 7182 111.78% 35910 180273 29 1 0 0 0 28 9
+0
9
+0
9
9 0 744.00
+0.00
744.00
29 19081 29
+ 0
25
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
13244.00
100.00% 115 114 1 11 9 2
  • 4 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 52 0 0 0 0 0 0 0 0 63 63 100%
+0
52
100 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 9
+0
7
2 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 9 9 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 0 0 0 0 0% 0 0 8 0 1 4 0 3 3
+0
3
+0
3
3 0 616.21
+0.00
602.40
52 15616 21
+ 0
1
10981 0 0 70.32
+0
4 / 4
+0
16 / 7
23765.00
+0.00 / +0.00
15430.89
64.93% 44 41 3 22 4 18
  • 2 OHT
  • 13 D.System
  • 36 COV
  • 4635 FHTC
  • 31 HGJ
  • 51 HGJ CERT
  • 52 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
  • 16-Jun-2026 Comissioning
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 0 1 0 0 1 0 0 4
+0
3
+0
3
3 0 610.00
+0.00
610.00
8 8051 3
+ 0
0
7223 0 0 89.72
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9174.10
73.49% 23 23 0 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 828 FHTC
  • 5 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 57 40 11 8 0 3 3 0 25 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 2710 18970 81300 33 1.22% 66 36855 2 0 1 1 0 0 3
+0
2
+0
2
2 0 306.24
+0.00
306.24
6 8465 1
+ 0
0
7538 0 0 89.05
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
7419.11
62.50% 15 15 0 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 927 FHTC
  • 5 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 95 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 45
+3
35
5 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 0 0 0 0 -- 247 170 45 27 0 0 18 10 3 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 3 9135 63945 274050 7215 78.98% 35976 217128 40 1 2 6 0 31 19
+0
17
+0
17
17 0 2276.45
+0.00
2262.64
95 51213 54
+ 0
26
44823 0 0 88
+0
20 / 20
+0
49 / 39
61363.00
+0.00
45268.10
74% 197 193 4 35 14 21
NCC Ltd.


8338933 Patwadh GOV 650 0 0 0 0 0 0 0 0 194 192 99%
+0
597
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
55 0 / 0 45 / 0 0 Integrated Verified Verified 1 5 Verified Verified 1 4 Verification Remarks Minutes of Meeting 335 0 55 0 37 4 18 2 14 9 4 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 5 + 0 = 5 35 13 4653 32571 139590 378146 8126.93% 827471 1361593 607 124 43 45 54 341 15
+0
15
+0
15
15 0 3885.16
+0.00
3718.52
650 101050 557
+ 0
146
100692 0 0 99.65
+0
16 / 16
+0
636 / 371
99181.00
+0.00 / +0.00
83938.49
84.63% 1048 998 50 181 102 79
  • 166 D.System
  • 14 COV
  • 358 FHTC
  • 93 HGJ
  • 504 HGJ CERT
  • 646 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
31-Oct-2026
Comissioning
31/10/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 31-Oct-2026 D.System
  • 31-Oct-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 226 0 12 0 12 0 0 0 0 20 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 14002 12 0 0 1 0 11 7
+0
7
+0
7
7 0 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10929.93
91.54% Yes 38 38 0 4 4 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
46
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 2 2 Not Verified Verified 1 2 Verification Remarks Minutes of Meeting 85 0 8 0 4 2 4 1 1 9 5 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 1 0 956 6692 28680 319 33.37% 18638 43966 45 0 1 3 0 41 4
+0
4
+0
4
4 0 1808.21
+0.00
1808.21
46 7268 46
+ 0
36
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
9191.10
97.03% 35 34 1 11 11 0
  • 10 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 1 1 1 80 42 0 0 64 64 100%
+0
80
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Verified Verified 1 9 Not Verified Not Verified 1 8 Verification Remarks Minutes of Meeting 64 0 9 0 1 8 8 3 1 19 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 3019 21133 90570 3292 109.04% 32716 102179 79 0 1 1 0 77 4
+0
4
+0
4
4 0 573.87
+0.00
571.68
80 12757 79
+ 0
73
12743 0 0 99.89
+0
5 / 5
+0
80 / 78
12858.00
+0.00 / +0.00
11482.31
89.30% 116 114 2 18 18 0
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 7 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 20-Mar-2026 1 0 0 0 0 0 0 0 33 33 100%
+0
186
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 83 0 9 2 0 0 7 2 1 23 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 3 5597 39179 167910 8480 151.51% 60546 246220 178 0 1 14 4 159 5
+0
5
+0
5
5 0 1421.64
+0.00
1418.76
186 19691 184
+ 0
153
19595 0 0 99.51
+0
6 / 6
+0
185 / 174
23145.00
+0.00 / +0.00
20488.45
88.52% 381 375 6 41 41 0
  • 2 D.System
  • 96 FHTC
  • 2 HGJ
  • 33 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 155 0 10 0 8 0 2 2 0 4 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 582 4074 17460 8 1.37% 106464 133934 26 1 8 11 1 5 6
+0
6
+0
6
6 0 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +0.00
16072.90
88.16% 71 67 4 10 8 2
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 0 0
  +0
3 | 3
3 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 0 0 0 0 0% 0 0 3 2 0 1 0 0 1
+0
1
+0
1
1 0 102.16
+0.00
102.16
4 1168 1
+ 0
0
596 0 0 51.03
+0
2 / 2
+0
3 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 6 5 1 0 0 0
  • 1 COV
  • 572 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 361 5 1 1 1 80 42 0 0 169 169 100% 354 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 0 0
  +0
39 | 39
39 0 / 0 1 / 0 30 -- -- -- 3 2 3 11 0 1 2 10 -- 387 0 39 5 13 10 21 8 3 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 12 6 10154 71078 304620 12099 119.16% 218364 526299 331 3 11 30 5 282 20
+0
20
+0
20
20 0 4824.34
+0.00
4819.27
361 58561 354
+ 0
305
57871 0 0 99
+0
25 / 25
+0
356 / 289
66677.00
+0.00
60047.67
90% 609 595 14 80 78 2
Total Sonbhadra 1297 7 8 4 4 4 300 180 0 0 546 543 99%
+0
1228
94.68 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 178
+0
168
5 5 0 0 0
  +0
163 | 163
159 0 / 0 106 / 0 72 -- -- -- 5 5 16 38 1 3 15 38 -- 1421 170 178 35 73 36 70 21 23 -- -- 0 + 0 + 0 + 11 + 0 = 11 0 + 0 + 0 + 26 + 0 = 26 60 27 33752 236264 1012560 421994 1250.28% 1191831 2372475 1141 133 57 84 63 804 77
+0
75
+0
75
75 0 15534.95
+0.00
15349.43
1297 286048 1155
+ 0
624
278603 0 0 97.40
+0
83 / 83
+0
1224 / 784
313955.00
+0.00 / +0.00
265269.41
84.49% 0 1 0 2401 2320 81 363 261 102
Project Completion Plan

Minutes of Meeting Date -