Scheme ID: 8388647 Name of Scheme: Charaura Mustafabad No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4093 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 14-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 M/117.30 M Charaura Mustfabad 28.471952 77.946585
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibl 800 LPM/47 M Charaura Mustfabad 28.471952 77.946585
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/12 M Charaura Mustfabad 28.472158 77.946585
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.64
2 HDPE 75 0.73
3 HDPE 90 1.11
4 HDPE 140 0.21
5 HDPE 160 0.66
HSC Connection
Sno. Total Nos.
1 831
Other Details
2.59
2.49
2.49
10-Jan-2026
11-Jan-2026