Project Completion Certificate (Ground Water)
Scheme ID: 8388646 Name of Scheme: Janaura No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2763 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 14-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.01 M/93.6 M Janaura 28.462219 78.001654
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550 LPM/46.60 M Janaura 28.462219 78.001654
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/12 Janaura 28.462219 78.001554
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.97
2 HDPE 75 0.36
3 HDPE 90 0.20
4 HDPE 110 0.31
5 HDPE 140 0.31
HSC Connection
Sno. Total Nos.
1 550
Other Details
1.80
1.70
1.73
10-Jan-2026
11-Jan-2026