Project Completion Certificate (Ground Water)
Scheme ID: 8388625 Name of Scheme: Kaulsena No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2824 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 12-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.04 M/77.39 M Kaulsena 28.350782 77.851339
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM/47 M Kaulsena 28.350782 77.851339
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL/12 M Kaulsena 28.350873 77.851244
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.82
2 HDPE 75 0.28
3 HDPE 110 0.12
4 HDPE 125 0.27
5 HDPE 160 0.22
6 HDPE 180 0.41
HSC Connection
Sno. Total Nos.
1 545
Other Details
1.75
1.75
1.77
22-Dec-2025
23-Dec-2025