Project Completion Certificate (Ground Water)
Scheme ID: 8386690 Name of Scheme: Jungal Mathia Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1430 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 17-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/138.74 Jungle Mathia 26.6992 83.5402
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 21/40 Jungle Mathia 26.6992 83.5402
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/12 Jungle Mathia 26.6992 83.5402
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.443 Laying Completed
2 HDPE 75 1.777 Laying Completed
3 HDPE 90 0.961 Laying Completed
4 HDPE 110 0.612 Laying Completed
5 HDPE 140 0.59 Laying Completed
HSC Connection
Sno. Total Nos.
Other Details
2.72
0.00
2.70
24-Feb-2024
22-Nov-2024