Project Completion Certificate (Ground Water)
Scheme ID: 8362627 Name of Scheme: Niyamatpur bihari No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Oct-2022 Actual Date of Completion (Capex): 25-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.08 Mtr./147.81 Mtr. Niyamatpur Bihari 26.607341 79.504994
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 41.5(M3/Hr.)/ 48 Mtr. Niyamatpur Bihari 26.607341 79.504994
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL/ 16 Mtr. Niyamatpur Bihari 26.607256 79.504919
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 .0136
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.247
2 HDPE 90 .25
3 HDPE 160 .513
4 HDPE 180 3.580
HSC Connection
Sno. Total Nos.
1 579
Other Details
2.44
2.72
2.72
24-Jun-2024
25-Jun-2024