Project Completion Certificate (Ground Water)
Scheme ID: 8361684 Name of Scheme: BIJHAULI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1859 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2025 Actual Date of Completion (Capex): 26-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 600 LPM 27.01m/118.94m Bijhauli 25.805412 80.70489
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 12.5 HP 600 LPM/56m Bijhauli 25.805412 80.70489
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 KL/12 M Bijhauli 25.805412 80.70489
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 80 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.3201
2 HDPE 75 0.266
3 HDPE 90 0.06
4 HDPE 110 1.908
5 HDPE 125 1.063
6 HDPE 140 0.765
HSC Connection
Sno. Total Nos.
1 309
Other Details
2.01
0.00
1.97
26-Jun-2023
27-Jun-2023