| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360930 | Name of Scheme: Babura | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 2591 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-May-2025 | Actual Date of Completion (Capex): 21-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X300 | 9.03/41.98 | Babura | 25.7946 | 82.536067 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-15HP | 550/55.10 | Babura | 25.7946 | 82.536067 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/20M | Babura | 25.794542 | 82.535937 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 0.617 | |
| 2 | HDPE PIPE PN-6 | 140 | 0.196 | |
| 3 | HDPE PIPE PN-6 | 110 | 1.556 | |
| 4 | HDPE PIPE PN-6 | 90 | 0.072 | |
| 5 | HDPE PIPE PN-6 | 75 | 1.103 | |
| 6 | HDPE PIPE PN-6 | 63 | 11.101 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 394 |