| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360793 | Name of Scheme: Karsawa | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2278 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jun-2025 | Actual Date of Completion (Capex): 26-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell 600 LPM | 27.01(m)/118.94(m) | Karsawa | 25.816938 | 80.701842 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible 12.5HP | 600 LPM/56 M | Karsawa | 25.816938 | 80.701842 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL/12 M | Karsawa | 25.816938 | 80.701842 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 125 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6857.83 | |
| 2 | HDPE | 75 | 313.5 | |
| 3 | HDPE | 90 | 798.7 | |
| 4 | HDPE | 110 | 197 | |
| 5 | HDPE | 125 | 772.1 | |
| 6 | HDPE | 140 | 444 | |
| 7 | HDPE | 160 | 175.5 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 660 |