Project Completion Certificate (Ground Water)
Scheme ID: 8360398 Name of Scheme: HUSAINPUR KALA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2755 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2021 Actual Date of Completion (Capex): 25-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.05 MTR / 120.16 MTR HUSAINPUR KALA 29.110466 78.524211
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.50 HP 350 LPM / 54 MTR HUSAINPUR KALA 29.110466 78.524211
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL / 12 MTR HUSAINPUR KALA 29.110327 78.52423
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.050
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-06 CLASS PE-100 180 0.158
2 HDPE PIPE PN-06 CLASS PE-100 160 0.067
3 HDPE PIPE PN-06 CLASS PE-100 140 0.198
4 HDPE PIPE PN-06 CLASS PE-100 110 0.312
5 HDPE PIPE PN-06 CLASS PE-100 90 0.541
6 HDPE PIPE PN-06 CLASS PE-100 75 0.714
7 HDPE PIPE PN-06 CLASS PE-100 63 0.882
HSC Connection
Sno. Total Nos.
1 220
Other Details
1.51
1.48
1.51
24-Oct-2024
25-Oct-2024