Project Completion Certificate (Ground Water)
Scheme ID: 8359757 Name of Scheme: Sakhi, Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2830 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-May-2023 Actual Date of Completion (Capex): 12-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.03/152.89 Sakhi 26.9174 83.2501
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 36/40 Sakhi 26.9174 83.2501
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 175/12 Sakhi 26.9174 83.2501
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.153 Laying Completed
2 HDPE 75 5.647 Laying Completed
3 HDPE 90 2.748 Laying Completed
4 HDPE 110 1.101 Laying Completed
5 HDPE 140 0.155 Laying Completed
6 HDPE 160 0.006 Laying Completed
HSC Connection
Sno. Total Nos.
1 445
Other Details
2.68
0.00
2.62
11-Feb-2024
10-Jan-2026