Project Completion Certificate (Ground Water)
Scheme ID: 8359436 Name of Scheme: Banshi No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 4015 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.14 M/80.48 M Banshi 26.708987 79.450635
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (80.2 M3/Hr.)/40 M Banshi 26.708987 79.450635
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL/12M Banshi 26.752337 79.556495
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 .029 Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.013
2 HDPE 75 1.042
3 HDPE 90 2.138
4 HDPE 110 0.42
5 HDPE 140 0.858
6 HDPE 180 0.132
HSC Connection
Sno. Total Nos.
1 605
Other Details
3.16
3.20
3.20
01-Jun-2023
01-Sep-2023