| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359399 | Name of Scheme: Asjana | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 3610 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Sep-2022 | Actual Date of Completion (Capex): 15-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 30.11 Mtr./59.4 Mtr. | Asjana | 26.753058 | 79.531421 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | ( 53.5M3/Hr.)/52Mtr. | Asjana | 26.753058 | 79.531421 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/12 | Asjana | 26.753026 | 79.531318 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | .015 | |
| 2 | D.I. | 100 | .002 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.53 | |
| 2 | HDPE | 75 | 0.43 | |
| 3 | HDPE | 90 | .81 | |
| 4 | HDPE | 110 | 0.19 | |
| 5 | HDPE | 140 | 0.71 | |
| 6 | HDPE | 160 | 0.27 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 640 |