Project Completion Certificate (Ground Water)
Scheme ID: 20107476 Name of Scheme: SAHERUA WSS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4332 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Aug-2025 Actual Date of Completion (Capex): 25-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TW 18/144.47 Saherua 25.804543 81.943833
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 18/50 Saherua 25.804543 81.943833
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 125 0.0125
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 13.600
2 HDPE 75 0.365
3 HDPE 90 0.227
4 HDPE 110 0.381
5 HDPE 140 0.753
HSC Connection
Sno. Total Nos.
1 610
Other Details
3.28
0.00
0.00
24-Jun-2025
25-Jun-2025