| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20106941 | Name of Scheme: HANSAPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1460 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-Jun-2024 | Actual Date of Completion (Capex): 03-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 18/66.3 | Jadipur | 26.236296 | 82.115470 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 310 LPM/42M | Jadipur | 26.236296 | 82.115470 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 100 KL/12M | Jadipur | 26.236296 | 82.115470 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.0315 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 63 | 3.46 | |
| 2 | HDPE Pipe | 75 | 2.257 | |
| 3 | HDPE Pipe | 90 | 0.755 | |
| 4 | HDPE Pipe | 110 | 0.793 | |
| 5 | HDPE Pipe | 140 | 0.216 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 190 |