Scheme ID: 20102294 Name of Scheme: BHARUKA WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2328 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 02-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24/126.08 Bharuka 29.615246 78.112094
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 550/51 Bharuka 29.615246 78.112094
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 14 Mtr Bharuka 29.615246 78.112094
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.4489
2 HDPE 75 0.377
3 HDPE 110 0.647
4 HDPE 125 0.039
5 HDPE 160 0.4514
HSC Connection
Sno. Total Nos.
1 407
Other Details
2.24
0.00
2.26
02-Jul-2025