| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102294 | Name of Scheme: BHARUKA WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2328 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 02-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24/126.08 | Bharuka | 29.615246 | 78.112094 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 550/51 | Bharuka | 29.615246 | 78.112094 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 14 Mtr | Bharuka | 29.615246 | 78.112094 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.4489 | |
| 2 | HDPE | 75 | 0.377 | |
| 3 | HDPE | 110 | 0.647 | |
| 4 | HDPE | 125 | 0.039 | |
| 5 | HDPE | 160 | 0.4514 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 407 |