Project Completion Certificate (Ground Water)
Scheme ID: 20102037 Name of Scheme: SALEMPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1240 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 27-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 260 LPM" 12 M / 49.5 M Salempur 25.50991 81.154935
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 15.6 M3 / 55 M Salempur 25.50991 81.154935
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 75 KL / 14 M Salempur 25.509829 81.154885
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 0.5112
2 HDPE PN-6 75 1.1218
3 HDPE PN-6 90 0.42925
4 HDPE PN-6 110 0.4506
5 HDPE PN-6 125 0.0806
6 HDPE PN-6 140 0.1424
7 HDPE PN-6 160 0.0786
8 HDPE PN-6 200 0.022
HSC Connection
Sno. Total Nos.
1 279
Other Details
1.51
0.00
1.51
13-Jun-2025
14-Jun-2025