| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102036 | Name of Scheme: LILRA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1630 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 13-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 320 LPM | 19 Mtr / 83.35 Mtr | LILRA | 25.699604 | 80.722194 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 7.5 HP Submersible Pump | 320 LPM / 55 Mtr | LILRA | 25.699604 | 80.722194 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 100 KL / 18 Mtr | LILRA | 25.699604 | 80.722194 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K.9 | 100 | 0.023 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 1.4952 | |
| 2 | HDPE PIPE | 75 | 1.0295 | |
| 3 | HDPE PIPE | 90 | 0.8009 | |
| 4 | HDPE PIPE | 110 | 0.085 | |
| 5 | HDPE PIPE | 140 | 0.195 | |
| 6 | HDPE PIPE | 160 | 0.314 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 294 |