Scheme ID: 20102032 Name of Scheme: Mohammadpur Musalman Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Oct-2024 Actual Date of Completion (Capex): 09-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/69.80 Mohammadpur Musalman 26º 28' 57.91" N 82º 47' 26.00 E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 35.40/46 Mohammadpur Musalman 26º 28' 57.91" N 82º 47' 26.00 E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 175/14 Mohammadpur Musalman 26º 28' 57.91" N 82º 47' 26.00 E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.811
2 HDPE Pipe PN-6: Class PE-100 75 0.134
3 HDPE Pipe PN-6: Class PE-100 90 0.218
4 HDPE Pipe PN-6: Class PE-100 110 0.055
5 HDPE Pipe PN-6: Class PE-100 140 0.399
6 HDPE Pipe PN-6: Class PE-100 160 0.161
HSC Connection
Sno. Total Nos.
1 240
Other Details
2.18
0.00
2.18
20-Jan-2026
21-Jan-2026