Project Completion Certificate (Ground Water)
Scheme ID: 20101982 Name of Scheme: GUJARTOLA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1307 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Dec-2024 Actual Date of Completion (Capex): 12-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 256.80 GUJJAR TOLA 26.225112 81.621497
2 200MM PLAIN PIPE 66.00 GUJJAR TOLA 26.225112 81.621497
3 150MM SLOTTED PIPE 22.00 GUJJAR TOLA 26.225112 81.621497
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 150 LPM / 50 MTR GUJJAR TOLA 26.225112 81.621497
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 12 MTR GUJJAR TOLA 26.225112 81.621497
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.193
2 HDPE PIPE 75 0.555
3 HDPE PIPE 63 4.930
4 HDPE PIPE 110 0.164
5 HDPE PIPE 140 0.158
HSC Connection
Sno. Total Nos.
1 390
Other Details
1.84
0.00
2.07
11-Sep-2024
26-Dec-2024