Project Completion Certificate (Ground Water)
Scheme ID: 20101904 Name of Scheme: BASEDA NARAYAN WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1147 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 04-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 22 / 116.13 Hakimpur Chandan 29.367758 78.460945
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 250 / 52 Hakimpur Chandan 29.367758 78.460945
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 /14 Hakimpur Chandan 29.367758 78.460945
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.717
2 HDPE 75 0.640
3 HDPE 90 0.520
4 HDPE 110 1.217
5 HDPE 160 0.015
HSC Connection
Sno. Total Nos.
1 189
Other Details
1.72
0.00
1.73
04-Dec-2025
05-Dec-2025