Scheme ID: 20101008 Name of Scheme: Karnjahwa Water Supplym Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2990 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 13-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/136.05 Karanjhawa 26.7777 83.4938
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/43 Karanjhawa 26.7777 83.4958
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/14 Karanjhawa 26.7777 83.4958
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.767 Laying Completed
2 HDPE 75 0.153 Laying Completed
3 HDPE 90 0.466 Laying Completed
4 HDPE 110 0.297 Laying Completed
5 HDPE 140 0.174 Laying Completed
6 HDPE 160 0.989 Laying Completed
HSC Connection
Sno. Total Nos.
1 610
Other Details
2.94
0.00
2.94
12-Mar-2025
10-Jan-2026