Project Completion Certificate (Ground Water)
Scheme ID: 20100991 Name of Scheme: JASAURA GRAMM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1960 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2025 Actual Date of Completion (Capex): 05-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 mm Plain Pipe 58.13 Jasaura 27.100052 79.829876
2 200 mm Plain Pipe 60.3 Jasaura 27.100052 79.829876
3 150 mm Slotted Pipe 18 Jasaura 27.100052 79.829876
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 410/69 Jasaura 27.100052 79.829876
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zn-Al Tank 125/12 Jasaura 27.100052 79.829876
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 80 9.45
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Distribution Pipe/HDPE 63 3.807
2 Distribution Pipe/HDPE 75 0.360
3 Distribution Pipe/HDPE 90 0.190
4 Distribution Pipe/HDPE 110 0.284
HSC Connection
Sno. Total Nos.
1 360
Other Details
197.89
0.00
0.00
11-Aug-2025
15-Aug-2025