Project Completion Certificate (Ground Water)
Scheme ID: 20100814 Name of Scheme: AMILIHA PAL No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 4830 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M./132M. AMILIHAPAL 25'80162684"N 81'22457409"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 1010/60 AMILIHAPAL 25'80162684"N 81'22457409"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 300 KL/ 18 M AMILIHAPAL 25'80162684"N 81'22457409"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 150 0.01150
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 1.2935
2 HDPE 180 0.3406
3 HDPE 160 1.1574
4 HDPE 140 0.3483
5 HDPE 125 0.6017
6 HDPE 110 1.8279
7 HDPE 90 2.4458
8 HDPE 75 3.891
9 HDPE 63 6.744
HSC Connection
Sno. Total Nos.
1 990
Other Details
4.11
0.00
4.20
12-Mar-2025
13-Mar-2025