Project Completion Certificate (Ground Water)
Scheme ID: 20100749 Name of Scheme: PAIRUA MIHIPURWA RF PWS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2790 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 21-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Existing PAIRUA 28.025772 81.257027
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 30/38 PAIRUA 28.025772 81.257027
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/14 PAIRUA 28.025888 81.257093
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 100 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 3.88
2 HDPE Pipe PN-6; Class PE-100 90 0.46
3 HDPE Pipe PN-6; Class PE-100 110 0.08
HSC Connection
Sno. Total Nos.
1 73
Other Details
0.77
0.76
0.71
21-Nov-2025
22-Nov-2025