Project Completion Certificate (Ground Water)
Scheme ID: 20100649 Name of Scheme: CHITAI PUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1957 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 18-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20.03/75.28 CHITAI PUR 26.374794 81.868895
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 200 LPM/56M CHITAI PUR 26.374794 81.868895
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 75 KL/ 18 M CHITAI PUR 26.374794 81.868895
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0213
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.460
2 HDPE 90 0.750
3 HDPE 110 0.660
4 HDPE 140 0.322
5 HDPE 160 0.300
6 HDPE 180 0.160
HSC Connection
Sno. Total Nos.
1 245
Other Details
2.36
0.00
2.34
18-Sep-2024
20-Dec-2024