Project Completion Certificate (Ground Water)
Scheme ID: 20100308 Name of Scheme: Daulatpur Kalan Reorganisation WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 9315 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Mar-2025 Actual Date of Completion (Capex): 04-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells . Daulatpur Kalan 28.542065 78.153398
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1750 LPM / 53 M Daulatpur Kalan 28.542065 78.153398
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 500 KL / 16 M Daulatpur Kalan 28.542052 78.153377
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 19.64
2 HDPE 75 1.09
3 HDPE 90 0.79
4 HDPE 110 1.16
5 HDPE 125 0.23
6 HDPE 140 0.042
7 HDPE 160 0.14
8 HDPE 200 0.29
HSC Connection
Sno. Total Nos.
1 1592
Other Details
3.94
3.94
3.55
25-Feb-2026
01-Mar-2026