Project Completion Certificate (Ground Water)
Scheme ID: 20099337 Name of Scheme: Beramau No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2370 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 31-Dec-2023 Actual Date of Completion (Capex): 30-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 8/64.55 BERAMAU 26.315348 79.803844
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submesible 650/70 BERAMAU 26.315348 79.803844
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175/14 BERAMAU 26.315348 79.803844
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.08
2 HDPE 90 1.44
3 HDPE 110 1.23
4 HDPE 140 0.465
5 HDPE 160 0.072
HSC Connection
Sno. Total Nos.
1 550
Other Details
2.30
0.00
2.24
09-Apr-2024
10-Apr-2024