Project Completion Certificate (Ground Water)
Scheme ID: 20099330 Name of Scheme: Gauri Ratan Bangar No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1909 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 30-Apr-2023 Actual Date of Completion (Capex): 20-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 6/66.43 GAURI RATAN BANGAR 26.27232853 79.58955967
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450/74 GAURI RATAN BANGAR 26.27232853 79.58955967
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/18 GAURI RATAN BANGAR 26.27232853 79.58955967
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 25
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.42
2 HDPE 90 1.60
3 HDPE 110 1.27
4 HDPE 140 3.37
5 HDPE 160 0.014
HSC Connection
Sno. Total Nos.
1 423
Other Details
2.27
0.00
2.35
01-Apr-2024
02-Apr-2024