Project Completion Certificate (Ground Water)
Scheme ID: 20099162 Name of Scheme: Parghaipur PWS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1448 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 15-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 10m/131.31m Parghaipur 26.5810 79.5140
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 200LPM/49M Parghaipur 26.5810 79.5140
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50KL/12M Parghaipur 26.5810 79.5140
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0117
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.076
2 HDPE 90 0.762
3 HDPE 110 0.195
4 HDPE 125 0.344
HSC Connection
Sno. Total Nos.
1 289
Other Details
1.48
0.00
1.13
14-May-2025
16-May-2025