Project Completion Certificate (Ground Water)
Scheme ID: 20098332 Name of Scheme: BABUPUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 3145 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Apr-2024 Actual Date of Completion (Capex): 25-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.09/75.22 BABUPUR 26.375235 81.648445
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBERMIBLE 700/52 BABUPUR 26.375235 81.648445
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/14 BABUPUR 26.375235 81.648445
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0236
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.094
2 HDPE 90 2.504
3 HDPE 110 1.482
4 HDPE 140 0.469
5 HDPE 180 0.044
HSC Connection
Sno. Total Nos.
1 583
Other Details
3.56
0.00
3.53
25-May-2025
26-Aug-2025