| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098329 | Name of Scheme: RADHI PUR Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 1858 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Apr-2024 | Actual Date of Completion (Capex): 17-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 25/103.85 | RADHI PUR | 26.179755 | 81.653650 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 400 LPM/ 52 M | RADHI PUR | 26.179755 | 81.653650 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 125 KL/ 14 M | RADHI PUR | 26.179755 | 81.653650 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.024 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.317 | |
| 2 | HDPE | 90 | 0.541 | |
| 3 | HDPE | 110 | 0.309 | |
| 4 | HDPE | 140 | 0.149 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 258 |