Project Completion Certificate (Ground Water)
Scheme ID: 20098301 Name of Scheme: MUHIDEENPUR & KODARI WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 4203 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2024 Actual Date of Completion (Capex): 14-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300MM PLAIN PIPE 30.5 MUHIDEENPUR 26.396644 81.861536
2 300MM SLOTTED PIPE 10 MUHIDEENPUR 26.396644 81.861536
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PIPE 890LPM / 54MTR MUHIDEENPUR 26.396644 81.861536
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 275KL / 16MTR MUHIDEENPUR 26.396644 81.861536
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 .0215
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 5.165
2 HDPE PIPE 63 14.500
3 HDPE PIPE 110 .852
4 HDPE PIPE 140 .538
5 HDPE PIPE 180 .213
HSC Connection
Sno. Total Nos.
1 558
Other Details
4.32
0.00
4.25
17-Sep-2024
30-Dec-2024