Project Completion Certificate (Ground Water)
Scheme ID: 20098272 Name of Scheme: HARBALLABH PUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3123 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 06-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 tubewell 129.23/27.12 HARBALLABH PUR 27.178044 79.52235
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submerssible pump 700 HARBALLABH PUR 27.178044 79.52235
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 oht 200/14 HARBALLABH PUR 27.178044 79.52235
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 .0423 Clear Water Rising Main
2 DI 150 0.0047 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 6.55 Distribution Network
2 HDPE 63 5.97 Distribution Network
3 HDPE 110 0.531 Distribution Network
4 HDPE 140 0.558 Distribution Network
HSC Connection
Sno. Total Nos.
1 745
Other Details
3.65
3.60
3.64
08-Jul-2024
09-Jul-2024