Project Completion Certificate (Ground Water)
Scheme ID: 20097993 Name of Scheme: KUTRA MVS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 8122 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 11-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.0 M / 99.30 M KUTRA 27.34616 79.63436
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 700 LPM / 67 M KUTRA 27.34616 79.63436
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 20 M KUTRA 27.34616 79.63436
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / 150 .03 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 4.919 COMPLETE
2 HDPE 63 6.692 COMPLETE
3 HDPE 110 1.219 COMPLETE
4 HDPE 140 1.136 COMPLETE
5 HDPE 160 .729 COMPLETE
6 HDPE 180 .865 COMPLETE
7 HDPE 200 .665 COMPLETE
HSC Connection
Sno. Total Nos.
1 1076
Other Details
4.77
4.70
4.56
11-Apr-2024
12-Apr-2024