Project Completion Certificate (Ground Water)
Scheme ID: 20097916 Name of Scheme: TEKSARI BUJURG No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4060 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 22-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 850 LPM 19 M / 137.50 M Teksari Bujurg 25.821272 81.005286
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 25 HP Submersible Pump 850 LPM / 60 M Teksari Bujurg 25.821272 81.005286
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 250 KL / 18 M Teksari Bujurg 25.821272 81.005286
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K.9 150 0.01250
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-1.6 200 0.2413
2 HDPE Pipe PN-1.6 160 0.58550
3 HDPE Pipe PN-1.6 140 1.2631
4 HDPE Pipe PN-1.6 110 2.69620
5 HDPE Pipe PN-1.6 90 1.2481
6 HDPE Pipe PN-1.6 75 2.471
7 HDPE Pipe PN-1.6 63 5.2455
HSC Connection
Sno. Total Nos.
1 632
Other Details
4.26
0.00
3.86
14-May-2025
15-May-2025