Project Completion Certificate (Ground Water)
Scheme ID: 20097900 Name of Scheme: SARAI KHALIS No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2940 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 14-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M./97.85M SARAI KHALISH 25.785449 80.920091
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 600 LPM/60M SARAI KHALISH 25.785449 80.920091
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 175 KL / 18M SARAI KHALISH 25.785449 80.920091
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 80 0.02010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0
2 HDPE 180 0.139
3 HDPE 160 3.377
4 HDPE 140 0.711
5 HDPE 125 0.36
6 HDPE 110 0.735
7 HDPE 90 1.15
8 HDPE 75 1.925
9 HDPE 63 3.477
HSC Connection
Sno. Total Nos.
1 528
Other Details
2.54
0.00
3.00
10-Jun-2025
11-Jun-2025