Project Completion Certificate (Ground Water)
Scheme ID: 20097835 Name of Scheme: RAMWA PANTHUWA No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 9620 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Oct-2024 Actual Date of Completion (Capex): 18-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 790 LPM 27 M / 1O9 M Ramwa Panthuwa 25.880576 80.833031
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20 HP Submersible Pump 79O LPM / 6O M Ramwa Panthuwa 25.880576 80.833031
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 275 KL / 20 M Ramwa Panthuwa 25.880701 80.833014
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I K-9 150 0.0125
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE-100 200 1.99282
2 HDPE PN-6 PE-100 180 2.28127
3 HDPE PN-6 PE-100 160 1.42507
4 HDPE PN-6 PE-100 140 3.05066
5 HDPE PN-6 PE-100 125 3.50380
6 HDPE PN-6 PE-100 110 2.96010
7 HDPE PN-6 PE-100 90 4.94493
8 HDPE PN-6 PE-100 75 6.16017
9 HDPE PN-6 PE-100 63 9.66372
HSC Connection
Sno. Total Nos.
1 2093
Other Details
7.40
7.38
7.38
03-Dec-2024
04-Dec-2024