Project Completion Certificate (Ground Water)
Scheme ID: 20097828 Name of Scheme: MISTINI SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2276 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Jun-2027 Actual Date of Completion (Capex): 14-Sep-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 7M/35.50M MISTINI 27.68373 79.19404
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 200LPM/59M MISTINI 27.68373 79.19404
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75KL/14M MISTINI 27.68373 79.19404
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.256
2 HDPE PIPE 63 1.316
3 HDPE PIPE 110 0.531
4 HDPE PIPE 125 0.355
5 HDPE PIPE 140 0.261
6 HDPE PIPE 160 0.297
HSC Connection
Sno. Total Nos.
1 259
Other Details
1.76
1.71
1.76
14-Sep-2026
15-Sep-2026