Project Completion Certificate (Ground Water)
Scheme ID: 20097538 Name of Scheme: VIJAYEPUR No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 6980 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21/102.35 Vijaipur 25'.70997116"N 81.06548525"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 470/60 Vijaipur 25'.70997116"N 81.06548525"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/16m Vijaipur 25'.70997116"N 81.06548525"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.l. K-9 125 0.0064
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.1644
2 HDPE 180 0.7963
3 HDPE 160 0.016
4 HDPE 140 3.069
5 HDPE 110 1.6758
6 HDPE 90 2.9241
7 HDPE 75 3.4661
8 HDPE 63 13.7532
HSC Connection
Sno. Total Nos.
1 1150
Other Details
4.51
0.00
0.32
10-May-2025
11-May-2025