| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097530 | Name of Scheme: RARI | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4520 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-May-2023 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18/112.35 | rari | 25.6290916666 | 81.08457666 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 390LPM / 60 M | RARI | 25.6290916666 | 81.08457666 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150KL / 18 M | RARI | 25.6290916666 | 81.08457666 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 1.146 | |
| 2 | HDPE | 180 | 0.3892 | |
| 3 | HDPE | 160 | .3 | |
| 4 | HDPE | 140 | .1 | |
| 5 | HDPE | 125 | .759 | |
| 6 | HDPE | 110 | 0.9395 | |
| 7 | HDPE | 90 | 1.1547 | |
| 8 | HDPE | 75 | 0.7276 | |
| 9 | HPDE | 63 | 8.0247 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 728 |