Project Completion Certificate (Ground Water)
Scheme ID: 20097524 Name of Scheme: MURAWAN No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3770 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Oct-2024 Actual Date of Completion (Capex): 11-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 780 LPM 21M / 161.33M Murawan 25.896797 80.984225
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20 HP Submersible Pump 780 LPM / 60 M Murawan 25.896797 80.984225
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 225KL / 14M Murawan 25.896356 80.984208
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 125 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE-100 200 0.337
2 HDPE PN-6 PE-100 180 0.490
3 HDPE PN-6 PE-100 160 0.1745
4 HDPE PN-6 PE-100 140 2.044
5 HDPE PN-6 PE-100 125 0.4947
6 HDPE PN-6 PE-100 110 2.361
7 HDPE PN-6 PE-100 90 2.032
8 HDPE PN-6 PE-100 75 1.569
9 HDPE PN-6 PE-100 63 3.227
HSC Connection
Sno. Total Nos.
1 701
Other Details
3.44
3.44
3.44
10-Jun-2025
11-Jun-2025