| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097479 | Name of Scheme: REY | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 3450 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 11-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 690 LPM | 24 Mtr / 95.30 Mtr | REY | 25.863785 | 80.566715 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.5 HP Submersible Pump | 690 LPM / 60 M | REY | 25.863785 | 80.566715 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 200 KL /18 M | REY | 25.863785 | 80.566715 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 125 | 0.02420 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 2.93303 | |
| 2 | HDPE PIPE | 75 | 1.33160 | |
| 3 | HDPE PIPE | 90 | 1.47630 | |
| 4 | HDPE PIPE | 110 | 1.51810 | |
| 5 | HDPE PIPE | 125 | 0.966 | |
| 6 | HDPE PIPE | 160 | 0.50990 | |
| 7 | HDPE PIPE | 180 | 0.82560 | |
| 8 | HDPE PIPE | 200 | 0.51850 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 599 |