Project Completion Certificate (Ground Water)
Scheme ID: 20097479 Name of Scheme: REY No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3450 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 11-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 690 LPM 24 Mtr / 95.30 Mtr REY 25.863785 80.566715
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 17.5 HP Submersible Pump 690 LPM / 60 M REY 25.863785 80.566715
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 200 KL /18 M REY 25.863785 80.566715
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 125 0.02420
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 2.93303
2 HDPE PIPE 75 1.33160
3 HDPE PIPE 90 1.47630
4 HDPE PIPE 110 1.51810
5 HDPE PIPE 125 0.966
6 HDPE PIPE 160 0.50990
7 HDPE PIPE 180 0.82560
8 HDPE PIPE 200 0.51850
HSC Connection
Sno. Total Nos.
1 599
Other Details
3.23
0.00
3.22
10-Jun-2025