Project Completion Certificate (Ground Water)
Scheme ID: 20096866 Name of Scheme: Dundiyamau No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1480 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Mar-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 14.91/141.66 Dundiyamau 26.319248 79.876812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 23.10/63 Dundiyamau 26.319248 79.876812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75/12 Dundiyamau 26.319248 79.876812
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.020 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.996 As per Site
2 HDPE 75 0.089 As per Site
3 HDPE 90 0.215 As per Site
4 HDPE 110 2.240 As per Site
5 HDPE 140 0.054 As per Site
HSC Connection
Sno. Total Nos.
1 282
Other Details
1.33
1.54
1.54
05-Jun-2023