| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20096500 | Name of Scheme: AKABARI GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3040 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.00/94.00 | AKABARI | 28.127613 | 79.697401 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 37.74 M3 / 45 M | AKABARI | 28.127613 | 79.697401 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 175 KL-12 M | AKABARI | 28.127698 | 79.697480 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 150 | 0.0295 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6Kg | 63 | 5.600 | |
| 2 | HDPE / 6Kg | 75 | 0.588 | |
| 3 | HDPE / 6Kg | 90 | 0.089 | |
| 4 | HDPE / 6Kg | 110 | 0.065 | |
| 5 | HDPE / 6Kg | 140 | 0.070 | |
| 6 | HDPE / 6Kg | 160 | 0.306 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 496 |