Project Completion Certificate (Ground Water)
Scheme ID: 20095554 Name of Scheme: Thanwapur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2994 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 31-Dec-2023 Actual Date of Completion (Capex): 31-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 4/60.44 THANWAPUR 26.340706 79.816266
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650/74 THANWAPUR 26.340706 79.816266
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/18 THANWAPUR 26.340706 79.816266
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.82
2 HDPE 90 0.460
3 HDPE 110 0.627
4 HDPE 140 1.26
5 HDPE 160 0.523
HSC Connection
Sno. Total Nos.
1 570
Other Details
2.73
0.00
2.43
01-Apr-2024
02-Apr-2024